Agenda/Minutes of the VIS Meeting on 2017/8/18

2017/8/18 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

16th(Wed)

  • Assembled the end plate for F2.
  • Prepared for the F2.
  • Extended the EQ stop to the F2 stage.
  • Put the F2 onto the end plate. The F3 was suspended from the F2.
  • Removed a ballast from the F3.

17th(Thu)

  • Checked the ACCs.

18th(Fri)

  • Closed the F3 cap.

Plan for coming weeks

  • Installation of the Filter2 in X-end.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • 8/23-24 Draft Chamber Installation
  • 8/28 11:30 - 12:30 crane inspection
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • EP-30 safety
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • When to install the middle flange for ETMX

Travel Plans

  • Travel (Week of 8/21):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 8/28):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Hashimoto(Hosei):
    • Yoshioka (Toyama):
    • Kozu (ICRR):

Next meeting

On 2017/8/25(Fri)

KAGRA/Subgroups/VIS/VISMinutes20170818 (last edited 2017-08-18 14:31:45 by YoichiAso)