Size: 91
Comment:
|
Size: 2248
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
KAGRA/Subgroups/VIS/VISMinutes20170901について、ここに記述してください。 | = Agenda/Minutes of the VIS Meeting on 2017/9/1 = 2017/9/1 13:30 - Participants: == Progress report == Schedule Chart : ([[https://www.dropbox.com/s/035etsa8bbfzth2/VIS%20Overall%20Schedule-20170620.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/v9cqbycq6vgggng/VIS%20Overall%20Schedule-20170620.mpp?dl=0|MPP]]) * Type-A: * Type-B: * Type-Bp: === Type-A (Takahashi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Type B (Mark) === ==== Past week report ==== ==== Plan for coming weeks ==== === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === IMMT (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Watchdog system (Tanaka) === ==== Past week report ==== *I examined specific cost and necessary measures to set up for WDS in Kamioka.And I held a meeting to make estimates with several vendors.-->Budget plan.(But the accuracy is low because there is no data necessary for integrating the estimate.)However,this is a Japanese report.[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0071/E1707142/001/Project%20WDS%20budget%20plan%20170901.pdf | JGW-E1707142(PDF)]]. -->Waiting for an estimate. ==== Plan for coming weeks ==== *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. *Start production of equipment-->PCB check for main board(WDS main board).Ongoing. === Other site works === * End of Aug. to Nov.: Mozumi entrance will be closed === Safety === * Incidents: * Foreseen risks * Type-A: * Type-B: * Type-Bp: == Discussion == == Travel Plans == * Travel (Week of 9/4): * Takahashi: 4-7 * Okutomi: 4-8 * Sato: 4-8 * Ishizaki: 4-8 * Mark: 4-8 * Fabian: 4-8 * Hirata: 4-8 * Enzo: 4-8 * Shoda: 4-8 * Ohishi: 4-8 * Fujii: * Tanaka: * Yoshioka (Toyama): * Kozu (ICRR): * Arai (ICRR): * Travel (Week of 9/11): * Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: * Enzo: * Shoda: * Ohishi: * Fujii: * Tanaka: * Yoshioka (Toyama): * Kozu (ICRR): * Arai (ICRR): == Next meeting == On 2017/9/8(Fri) |
Agenda/Minutes of the VIS Meeting on 2017/9/1
2017/9/1 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
I examined specific cost and necessary measures to set up for WDS in Kamioka.And I held a meeting to make estimates with several vendors.-->Budget plan.(But the accuracy is low because there is no data necessary for integrating the estimate.)However,this is a Japanese report.JGW-E1707142(PDF).
-->Waiting for an estimate.
Plan for coming weeks
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Start production of equipment-->PCB check for main board(WDS main board).Ongoing.
Other site works
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 9/4):
- Takahashi: 4-7
- Okutomi: 4-8
- Sato: 4-8
- Ishizaki: 4-8
- Mark: 4-8
- Fabian: 4-8
- Hirata: 4-8
- Enzo: 4-8
- Shoda: 4-8
- Ohishi: 4-8
- Fujii:
- Tanaka:
- Yoshioka (Toyama):
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 9/11):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Yoshioka (Toyama):
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/9/8(Fri)