KAGRA/Subgroups/VIS/VISMinutes20170901について、ここに記述してください。 = Agenda/Minutes of the VIS Meeting on 2017/9/1 =

2017/9/1 13:30 -

Participants:

== Progress report ==
Schedule Chart : ([[https://www.dropbox.com/s/035etsa8bbfzth2/VIS%20Overall%20Schedule-20170620.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/v9cqbycq6vgggng/VIS%20Overall%20Schedule-20170620.mpp?dl=0|MPP]])

 * Type-A:
 * Type-B:
 * Type-Bp:

=== Type-A (Takahashi) ===
==== Past week report ====
==== Plan for coming weeks ====

=== Type B (Mark) ===
==== Past week report ====
==== Plan for coming weeks ====

=== Type-Bp (Shoda) ===
==== Past week report ====
==== Plan for coming weeks ====

=== IMMT (Ohishi) ===
==== Past week report ====
==== Plan for coming weeks ====

=== Watchdog system (Tanaka) ===
==== Past week report ====
 *I examined specific cost and necessary measures to set up for WDS in Kamioka.And I held a meeting to make estimates with several vendors.-->Budget plan.(But the accuracy is low because there is no data necessary for integrating the estimate.)However,this is a Japanese report.[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0071/E1707142/001/Project%20WDS%20budget%20plan%20170901.pdf | JGW-E1707142(PDF)]].
    -->Waiting for an estimate.

==== Plan for coming weeks ====
 *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

 *Start production of equipment-->PCB check for main board(WDS main board).Ongoing.

=== Other site works ===

 * End of Aug. to Nov.: Mozumi entrance will be closed

=== Safety ===
 * Incidents:

 * Foreseen risks
  * Type-A:
  * Type-B:
  * Type-Bp:

== Discussion ==

== Travel Plans ==
 * Travel (Week of 9/4):
  * Takahashi: 4-7
  * Okutomi: 4-8
  * Sato: 4-8
  * Ishizaki: 4-8
  * Mark: 4-8
  * Fabian: 4-8
  * Hirata: 4-8
  * Enzo: 4-8
  * Shoda: 4-8
  * Ohishi: 4-8
  * Fujii:
  * Tanaka:
  * Yoshioka (Toyama):
  * Kozu (ICRR):
  * Arai (ICRR):

 * Travel (Week of 9/11):
  * Takahashi:
  * Okutomi:
  * Sato:
  * Ishizaki:
  * Mark:
  * Fabian:
  * Hirata:
  * Enzo:
  * Shoda:
  * Ohishi:
  * Fujii:
  * Tanaka:
  * Yoshioka (Toyama):
  * Kozu (ICRR):
  * Arai (ICRR):

== Next meeting ==
On 2017/9/8(Fri)

Agenda/Minutes of the VIS Meeting on 2017/9/1

2017/9/1 13:30 -

Participants:

Progress report

Schedule Chart : (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • I examined specific cost and necessary measures to set up for WDS in Kamioka.And I held a meeting to make estimates with several vendors.-->Budget plan.(But the accuracy is low because there is no data necessary for integrating the estimate.)However,this is a Japanese report.JGW-E1707142(PDF).

    • -->Waiting for an estimate.

Plan for coming weeks

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

  • Start production of equipment-->PCB check for main board(WDS main board).Ongoing.

Other site works

  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 9/4):
    • Takahashi: 4-7
    • Okutomi: 4-8
    • Sato: 4-8
    • Ishizaki: 4-8
    • Mark: 4-8
    • Fabian: 4-8
    • Hirata: 4-8
    • Enzo: 4-8
    • Shoda: 4-8
    • Ohishi: 4-8
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 9/11):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/9/8(Fri)