2017/9/8 13:30 - | 2017/9/8 13:30 - 14:40 |
Line 4: | Line 4: |
Participants: | Participants: Mark, Aso, Shoda, Tanaka, Arai, Ishizaki, Sato, Okutomi, Enzo |
Line 13: | Line 13: |
* Type-B: * Type-Bp: |
* Type-B: BS installation into chamber: Sept. 21 * Type-Bp: PRM installation into chamber: Sept. 19 |
Line 48: | Line 48: |
* Assembled everything * We have set the SF and hanged the BF and below. The weight and balance were adjusted so that the keystone height is about 65.5 mm. The resonant frequency of SF is about 0.31 Hz. * Checked the transfer function. BF stage seems to be OK. it seems to be necessary to adjust more on IM stage. * All motor connections are checked. * We have a lot of dusts on the suspension since the ceiling is partially open because the company people hit the ceiling and it is now distorted. * Furuta-san and Hayakawa-san will fix it. * We need to clean the suspension carefully before the installation. |
|
Line 49: | Line 58: |
* IM adjustment and final status check * Cleaning the suspension, prepare for the installation (poles should stand on the inner framem etc...) |
|
Line 54: | Line 66: |
*Creating the final version for mass production and running its operation test.-->Creating boards(WDS main board for Low power). *Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision. *I held a meeting to make estimates with several vendors.-->Waiting for an estimate(Ongoing). |
|
Line 55: | Line 73: |
*Creating the final version for mass production and running its operation test.-->Implementation completion and operation test. *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. |
|
Line 56: | Line 78: |
* Crane inspection: Sept. 25 11:30 - 12:30 | |
Line 59: | Line 82: |
* Incidents: | * Incidents: no incident |
Line 62: | Line 85: |
* Type-A: * Type-B: * Type-Bp: |
* Type-A: Crane work. Work at height. * Type-B: Crane work. Work at height. * Type-Bp: No crane work. |
Line 68: | Line 91: |
* [[attachment:KAGRA_Organization_VIS.pdf]] * Will report the above plan to SEO. |
|
Line 70: | Line 95: |
* Watchdog * Output C |
* Watchdog: Check Michimura-kun's document for the required current. * Output C: Test it with BS. |
Line 74: | Line 99: |
* No VIS parameter used. * Seismometers * [[attachment:comp.png]] * It is difficult to judge if the expensive one is necessary or not. |
|
Line 86: | Line 115: |
* Ohishi: 14-15 | * Ohishi: 13-15 |
Line 89: | Line 118: |
* Yoshioka (Toyama): | * Yoshioka (Toyama): 11,12,14 |
Line 98: | Line 127: |
* Mark: * Fabian: * Hirata: * Enzo: * Shoda: |
* Mark: 19-22 * Fabian: 19-22 * Hirata: 19-22 * Enzo: 19-22 * Shoda: 19-22 |
Line 106: | Line 135: |
* Yoshioka (Toyama): * Kozu (ICRR): |
* Yoshioka (Toyama): 18,21 * Kozu (ICRR): 19-22 |
Agenda/Minutes of the VIS Meeting on 2017/9/8
2017/9/8 13:30 - 14:40
Participants: Mark, Aso, Shoda, Tanaka, Arai, Ishizaki, Sato, Okutomi, Enzo
Progress report
Schedule Chart
- Type-A: One week delay.
- Type-B: BS installation into chamber: Sept. 21
- Type-Bp: PRM installation into chamber: Sept. 19
Type-A (Takahashi)
Past week report
[X-end]
4th(Mon)
- Implemented the release sensors on the end plate for F1.
- Put the F1 on the end plate.
- Suspended the F2 and follows from the F1.
5th(Tue)
- Calibrated the LVDT in F1.
- Tuned the F1. The condition was changed by closing the cap. The lowest frequency was larger than 0.4Hz.
- Assembled the twist pair flat cables.
- Assembled the bridge frame.
6th(Wed)
- Tuned the F1 changing the compression of blades.
7th(Thu)
- Continued the F1 tuning. The lowest frequency was about 0.4 Hz.
- Started the cabling between the F2 and the F1.
8th(Fri)
- Continued the cabling.
Plan for coming weeks
- Lift down the F2 and F1 into the corrugate tube.
- Adjust the load on BF from the cross tube.
- Finish the installation of F1.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Assembled everything
- We have set the SF and hanged the BF and below. The weight and balance were adjusted so that the keystone height is about 65.5 mm. The resonant frequency of SF is about 0.31 Hz.
- Checked the transfer function. BF stage seems to be OK. it seems to be necessary to adjust more on IM stage.
- All motor connections are checked.
- We have a lot of dusts on the suspension since the ceiling is partially open because the company people hit the ceiling and it is now distorted.
- Furuta-san and Hayakawa-san will fix it.
- We need to clean the suspension carefully before the installation.
Plan for coming weeks
- IM adjustment and final status check
- Cleaning the suspension, prepare for the installation (poles should stand on the inner framem etc...)
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Creating the final version for mass production and running its operation test.-->Creating boards(WDS main board for Low power).
Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.
I held a meeting to make estimates with several vendors.-->Waiting for an estimate(Ongoing).
Plan for coming weeks
Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Other site works
- Crane inspection: Sept. 25 11:30 - 12:30
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents: no incident
- Foreseen risks
- Type-A: Crane work. Work at height.
- Type-B: Crane work. Work at height.
- Type-Bp: No crane work.
Discussion
- Sub-chiefs
- Will report the above plan to SEO.
- Coil driver circuit
- Watchdog: Check Michimura-kun's document for the required current.
- Output C: Test it with BS.
- Parameter list for the sensitivity curve calculation
https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0070/T1707038/006/kagra_sensitivity.pdf
- No VIS parameter used.
- Seismometers
- It is difficult to judge if the expensive one is necessary or not.
Travel Plans
- Travel (Week of 9/11):
- Takahashi: 11-12 (13 JPS)
- Okutomi: 11-15
- Sato: 11-15
- Ishizaki:
- Mark: 11-15 (13)
- Fabian: 14-15
- Hirata: 11-15
- Enzo: 11-15
- Shoda: 11-15 (13)
- Ohishi: 13-15
- Fujii:
- Tanaka:
- Yoshioka (Toyama): 11,12,14
- Kozu (ICRR): 11-15
- Arai (ICRR): 11-15
- Travel (Week of 9/18):
- Takahashi: 19-22
- Okutomi: 19-22
- Sato: 19-22
- Ishizaki: 19-21
- Mark: 19-22
- Fabian: 19-22
- Hirata: 19-22
- Enzo: 19-22
- Shoda: 19-22
- Ohishi:
- Fujii:
- Tanaka:
- Yoshioka (Toyama): 18,21
- Kozu (ICRR): 19-22
- Arai (ICRR):
Next meeting
On 2017/9/15(Fri)