Differences between revisions 7 and 8
Revision 7 as of 2017-09-08 10:02:37
Size: 2918
Editor: YoichiAso
Comment:
Revision 8 as of 2017-09-08 10:24:59
Size: 3603
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
 *Creating the final version for mass production and running its operation test.-->Creating boards(WDS main board for Low power).

 *Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.
 
 *I held a meeting to make estimates with several vendors.-->Waiting for an estimate(Ongoing).
Line 55: Line 61:
 *Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.

 *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Agenda/Minutes of the VIS Meeting on 2017/9/8

2017/9/8 13:30 -

Participants:

Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A: One week delay.
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

4th(Mon)

  • Implemented the release sensors on the end plate for F1.
  • Put the F1 on the end plate.
  • Suspended the F2 and follows from the F1.

5th(Tue)

  • Calibrated the LVDT in F1.
  • Tuned the F1. The condition was changed by closing the cap. The lowest frequency was larger than 0.4Hz.
  • Assembled the twist pair flat cables.
  • Assembled the bridge frame.

6th(Wed)

  • Tuned the F1 changing the compression of blades.

7th(Thu)

  • Continued the F1 tuning. The lowest frequency was about 0.4 Hz.
  • Started the cabling between the F2 and the F1.

8th(Fri)

  • Continued the cabling.

Plan for coming weeks

  • Lift down the F2 and F1 into the corrugate tube.
  • Adjust the load on BF from the cross tube.
  • Finish the installation of F1.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

IMMT (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Creating the final version for mass production and running its operation test.-->Creating boards(WDS main board for Low power).

  • Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.

  • I held a meeting to make estimates with several vendors.-->Waiting for an estimate(Ongoing).

Plan for coming weeks

  • Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Other site works

  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 9/11):
    • Takahashi: 11-12 (13 JPS)
    • Okutomi: 11-15
    • Sato: 11-15
    • Ishizaki:
    • Mark: 11-15 (13)
    • Fabian: 14-15
    • Hirata: 11-15
    • Enzo: 11-15
    • Shoda: 11-15 (13)
    • Ohishi: 14-15
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama):
    • Kozu (ICRR): 11-15
    • Arai (ICRR): 11-15
  • Travel (Week of 9/18):
    • Takahashi: 19-22
    • Okutomi: 19-22
    • Sato: 19-22
    • Ishizaki: 19-21
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/9/15(Fri)

KAGRA/Subgroups/VIS/VISMinutes20170908 (last edited 2017-09-09 12:47:58 by MarkBarton)