KAGRA/Subgroups/VIS/VISMinutes20170915について、ここに記述してください。 | = Agenda/Minutes of the VIS Meeting on 2017/9/15 = 2017/9/15 13:30 - Participants: == Progress report == === Schedule Chart === Type-A & Bp : ([[https://www.dropbox.com/s/k1dhwpiqwg4fgyz/VIS%20Overall%20Schedule-20170906.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/8mob3ezt9dnln0p/VIS%20Overall%20Schedule-20170906.mpp?dl=0|MPP]]) Type-B: ([[https://www.dropbox.com/s/u6gl1ld8n3b70hu/BS%20Install%202017-07-28%20export.pdf?dl=0|PDF]],[[https://www.dropbox.com/s/s2p3dq8c5oyt3s6/BS%20Install%202017-07-28%20export.mpp?dl=0|MPP]]) * Type-A: * Type-B: * Type-Bp: === Type-A (Takahashi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Type B (Mark) === ==== Past week report ==== ==== Plan for coming weeks ==== === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Watchdog system (Tanaka) === ==== Past week report ==== *Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision. *Creating the final version for mass production and running its operation test.-->Implementation completion and operation test. *I held a meeting to make estimates with several vendors.-->Price negotiation in progress(Ongoing). ==== Plan for coming weeks ==== *Creating the final version for mass production and running its operation test.-->Implementation completion and operation test. *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing. === Other site works === * End of Aug. to Nov.: Mozumi entrance will be closed === Safety === * Incidents: * Foreseen risks * Type-A: * Type-B: * Type-Bp: == Discussion == == Travel Plans == * Travel (Week of 9/18): * Takahashi: 19-22 * Okutomi: 19-22 * Sato: 19-22 * Ishizaki: 19-21 * Mark: 19-22 * Fabian: 19-22 * Hirata: 19-22 * Enzo: 19-22 * Shoda: 19-22 * Ohishi: * Fujii: * Tanaka: * Yoshioka (Toyama): 18,21 * Kozu (ICRR): 19-22 * Arai (ICRR): * Travel (Week of 9/25): * Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: * Enzo: * Shoda: * Ohishi: * Fujii: * Tanaka: * Yoshioka (Toyama): * Kozu (ICRR): * Arai (ICRR): == Next meeting == On 2017/9/22(Fri) |
Agenda/Minutes of the VIS Meeting on 2017/9/15
2017/9/15 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.
Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.
I held a meeting to make estimates with several vendors.-->Price negotiation in progress(Ongoing).
Plan for coming weeks
Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.
Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.
Other site works
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 9/18):
- Takahashi: 19-22
- Okutomi: 19-22
- Sato: 19-22
- Ishizaki: 19-21
- Mark: 19-22
- Fabian: 19-22
- Hirata: 19-22
- Enzo: 19-22
- Shoda: 19-22
- Ohishi:
- Fujii:
- Tanaka:
- Yoshioka (Toyama): 18,21
- Kozu (ICRR): 19-22
- Arai (ICRR):
- Travel (Week of 9/25):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Yoshioka (Toyama):
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/9/22(Fri)