Line 35: Line 35:
 *Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.

 *Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.

 *I held a meeting to make estimates with several vendors.-->Price negotiation in progress(Ongoing).
Line 36: Line 42:

 *Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.
 
 *Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Agenda/Minutes of the VIS Meeting on 2017/9/15

2017/9/15 13:30 -

Participants:

Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.

  • Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.

  • I held a meeting to make estimates with several vendors.-->Price negotiation in progress(Ongoing).

Plan for coming weeks

  • Creating the final version for mass production and running its operation test.-->Implementation completion and operation test.

  • Creation of extended I/O PCB(plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing.

Other site works

  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 9/18):
    • Takahashi: 19-22
    • Okutomi: 19-22
    • Sato: 19-22
    • Ishizaki: 19-21
    • Mark: 19-22
    • Fabian: 19-22
    • Hirata: 19-22
    • Enzo: 19-22
    • Shoda: 19-22
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama): 18,21
    • Kozu (ICRR): 19-22
    • Arai (ICRR):
  • Travel (Week of 9/25):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama):
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/9/22(Fri)