==== Oct. - Nov. 2017 ====
===== Type-A =====
 * Task list
  * In-vac test (Okutomi)
  * Swap cables
  * Assembly of BF

 * Man power
  * Takahashi
  * Okutomi
  * Sato
  * Ishizaki



===== Type-B =====
 * Task list
  * Order necessary things for SR including payloads
  * Assembly of SR IMs
  * Assembly of SRM PI


 * Man power
  * Takahashi
  * Okutomi
  * Sato
  * Ishizaki

----
==== Dec. 2017 - Mar. 2018 ====
===== Type-A =====
 * Man power
  * Takahashi
  * Sato
  * Ishizaki
  * Fujii (?)
  * Arai (?)
  * (Okutomi)

===== Type-B =====
 * Man power
  * Mark
  * Fabian
  * Hirata
  * Enzo
  * Kozu
  * Shoda (?)

Agenda/Minutes of the VIS Meeting on 2017/9/22

2017/9/22 13:30 -

Participants:


Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks


Other site works

  • BS duct connection: Oct 2 - 6
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:


Discussion

Plan for the coming months


Oct. - Nov. 2017

Type-A
  • Task list
    • In-vac test (Okutomi)
    • Swap cables
    • Assembly of BF
  • Man power
    • Takahashi
    • Okutomi
    • Sato
    • Ishizaki

Type-B
  • Task list
    • Order necessary things for SR including payloads
    • Assembly of SR IMs
    • Assembly of SRM PI
  • Man power
    • Takahashi
    • Okutomi
    • Sato
    • Ishizaki


Dec. 2017 - Mar. 2018

Type-A
  • Man power
    • Takahashi
    • Sato
    • Ishizaki
    • Fujii (?)
    • Arai (?)
    • (Okutomi)

Type-B
  • Man power
    • Mark
    • Fabian
    • Hirata
    • Enzo
    • Kozu
    • Shoda (?)

Travel Plans

  • Travel (Week of 9/25):
    • Takahashi: 25-29
    • Okutomi: 25-29
    • Sato: 25-29
    • Ishizaki: 25-29
    • Mark: 25-29
    • Fabian: 25-29
    • Hirata: 25-29
    • Enzo: 25-26
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama): 26,27,29
    • Kozu (ICRR): ??
    • Arai (ICRR):
  • Travel (Week of 10/2):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):