*Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.  *Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.
Line 55: Line 55:
*I held a meeting to make estimates with several vendors.-->Price negotiation failed.Because the assumed price is too low(The estimate of the manufacturing cost of the chassis was higher than expected).  *I held a meeting to make estimates with several vendors.-->Price negotiation failed.Because the assumed price is too low(The estimate of the manufacturing cost of the chassis was higher than expected).
Line 58: Line 58:
*Creating the final version for mass production and running its operation test.-->Implementation is complete and completion of the initial operation test.  *Creating the final version for mass production and running its operation test.-->Implementation is complete and completion of the initial operation test.
Line 62: Line 62:
*Execution of the final version operation test for mass production ->Start of detailed exam.  *Execution of the final version operation test for mass production ->Start of detailed exam.
Line 64: Line 64:
*Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing(Start of mechanical design).  *Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing(Start of mechanical design).

Agenda/Minutes of the VIS Meeting on 2017/9/22

2017/9/22 13:30 -

Participants:


Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • PRM installed
    • The suspension was installed.
    • But we found that the tank cannot be placed at the +y side of the PRM, since the space inside the clean booth was so tight. The tank was moved to the -y side using the fork lift and crane thanks to Kimura-san, Sawada-san, and Endo-san.
    • Cabling was almost done, but not yet checked.
    • Pylons for oplevs are installed. But no view port, nor oplev setup.

Plan for coming weeks

  • No site work in the week of Sep. 25th
  • In the week of Nov. 2nd:
    • Cabling check
    • Remove all the FC for the interferometer alignment, which will start from Nov. 10th.
    • Oplev setup, including viewport.
    • Suspension release and status check.
    • PR2 BF GAS status check. Turning on PR2 damping.

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Waiting for information provision.

  • I held a meeting to make estimates with several vendors.-->Price negotiation failed.Because the assumed price is too low(The estimate of the manufacturing cost of the chassis was higher than expected).

    • (Current assumed price about 900,000 yen -->Vendor's quotation price about 2,000,000 yen)

  • Creating the final version for mass production and running its operation test.-->Implementation is complete and completion of the initial operation test.

Plan for coming weeks

  • Execution of the final version operation test for mass production ->Start of detailed exam.

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing(Start of mechanical design).


Other site works

  • Regular inspection of the forklift: Sept. 26 (Tue) 11:30~12:30
  • BS duct connection: Oct 2 - 6
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:


Discussion

Plan for the coming months


Oct. - Nov. 2017

Type-A

  • Task list
    • In-vac test (EX)
    • Swap cables (EX)
    • Transpotation of IPs and SFs (ITM)
    • Assembly of BF (ITM)
    • Check ACCs (ITM)
    • Lift up items (ITM)
    • Site preparation (ITM)
  • Man power
    • Takahashi
    • Okutomi
    • Sato
    • Ishizaki

Type-B

  • Task list
    • Order necessary items for SR including payloads
    • Make an inventory of SR parts
    • Assembly of SR IMs
    • Assembly of SRM PI
    • ??
  • Man power
    • Mark
    • Fabian
    • Hirata
    • Enzo
    • Kozu

Type-Bp

  • Task list
    • Tuning
    • Mirror position measurements
  • Man power
    • Shoda
    • Arai


Dec. 2017 - Mar. 2018

Type-A

  • Man power
    • Takahashi
    • Sato
    • Ishizaki
    • Fujii (?)
    • Arai (?)
    • (Okutomi)

Type-B

  • Man power
    • Mark
    • Fabian
    • Hirata
    • Enzo
    • Kozu
    • Shoda (?)


Travel Plans

  • Travel (Week of 9/25):
    • Takahashi: 25-29
    • Okutomi: 25-29
    • Sato: 25-29
    • Ishizaki: 25-29
    • Mark: 25-29
    • Fabian: 25-29
    • Hirata: 25-29
    • Enzo: 25-26
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama): 26,27,29
    • Kozu (ICRR): ??
    • Arai (ICRR):
  • Travel (Week of 10/2):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/9/29(Fri)