===== Type-A ===== '''Type-A'''
Line 65: Line 66:
  * ??
Line 73: Line 75:
'''Type-B'''
Line 74: Line 77:
===== Type-B =====
Line 77: Line 79:
  * Make an inventory of SR parts
Line 78: Line 81:
  * Assembly of SRM PI
  * Assembly of SRM PI
 * ??
Line 82: Line 85:
  * Takahashi
  * Okutomi
  * Sato
  * Ishizaki
  * Mark
  * Fabian
  * Hirata
  * Enzo
  * Kozu

'''Type-Bp'''

 * Task list
  * Tuning

 * Man power
  * Shoda
  * Arai
Line 89: Line 102:
===== Type-A =====
'''Type-A'''
Line 98: Line 113:
===== Type-B ===== '''Type-B'''
Line 107: Line 123:
----

Agenda/Minutes of the VIS Meeting on 2017/9/22

2017/9/22 13:30 -

Participants:


Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

Plan for coming weeks


Other site works

  • BS duct connection: Oct 2 - 6
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:


Discussion

Plan for the coming months


Oct. - Nov. 2017

Type-A

  • Task list
    • In-vac test (Okutomi)
    • Swap cables
    • Assembly of BF
    • ??
  • Man power
    • Takahashi
    • Okutomi
    • Sato
    • Ishizaki

Type-B

  • Task list
    • Order necessary things for SR including payloads
    • Make an inventory of SR parts
    • Assembly of SR IMs
    • Assembly of SRM PI
    • ??
  • Man power
    • Mark
    • Fabian
    • Hirata
    • Enzo
    • Kozu

Type-Bp

  • Task list
    • Tuning
  • Man power
    • Shoda
    • Arai


Dec. 2017 - Mar. 2018

Type-A

  • Man power
    • Takahashi
    • Sato
    • Ishizaki
    • Fujii (?)
    • Arai (?)
    • (Okutomi)

Type-B

  • Man power
    • Mark
    • Fabian
    • Hirata
    • Enzo
    • Kozu
    • Shoda (?)


Travel Plans

  • Travel (Week of 9/25):
    • Takahashi: 25-29
    • Okutomi: 25-29
    • Sato: 25-29
    • Ishizaki: 25-29
    • Mark: 25-29
    • Fabian: 25-29
    • Hirata: 25-29
    • Enzo: 25-26
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Yoshioka (Toyama): 26,27,29
    • Kozu (ICRR): ??
    • Arai (ICRR):
  • Travel (Week of 10/2):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/9/29(Fri)