* PRM installed * The suspension was installed. * But we found that the tank cannot be placed at the +y side of the PRM, since the space inside the clean booth was so tight. The tank was moved to the -y side using the fork lift and crane thanks to Kimura-san, Sawada-san, and Endo-san. * Cabling was almost done, but not yet checked. * Pylons for oplevs are installed. But no view port, nor oplev setup. |
|
Line 30: | Line 36: |
* No site work in the week of Sep. 25th * In the week of Nov. 2nd: * Cabling check * Remove all the FC for the interferometer alignment, which will start from Nov. 10th. * Oplev setup, including viewport. * Suspension release and status check. * PR2 BF GAS status check. Turning on PR2 damping. |
Agenda/Minutes of the VIS Meeting on 2017/9/22
2017/9/22 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- PRM installed
- The suspension was installed.
- But we found that the tank cannot be placed at the +y side of the PRM, since the space inside the clean booth was so tight. The tank was moved to the -y side using the fork lift and crane thanks to Kimura-san, Sawada-san, and Endo-san.
- Cabling was almost done, but not yet checked.
- Pylons for oplevs are installed. But no view port, nor oplev setup.
Plan for coming weeks
- No site work in the week of Sep. 25th
- In the week of Nov. 2nd:
- Cabling check
- Remove all the FC for the interferometer alignment, which will start from Nov. 10th.
- Oplev setup, including viewport.
- Suspension release and status check.
- PR2 BF GAS status check. Turning on PR2 damping.
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- BS duct connection: Oct 2 - 6
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Plan for the coming months
Oct. - Nov. 2017
Type-A
- Task list
- In-vac test
- Swap cables
- Assembly of BF
- ??
- Man power
- Takahashi
- Okutomi
- Sato
- Ishizaki
Type-B
- Task list
- Order necessary items for SR including payloads
- Make an inventory of SR parts
- Assembly of SR IMs
- Assembly of SRM PI
- ??
- Man power
- Mark
- Fabian
- Hirata
- Enzo
- Kozu
Type-Bp
- Task list
- Tuning
- Mirror position measurements
- Man power
- Shoda
- Arai
Dec. 2017 - Mar. 2018
Type-A
- Man power
- Takahashi
- Sato
- Ishizaki
- Fujii (?)
- Arai (?)
- (Okutomi)
Type-B
- Man power
- Mark
- Fabian
- Hirata
- Enzo
- Kozu
- Shoda (?)
Travel Plans
- Travel (Week of 9/25):
- Takahashi: 25-29
- Okutomi: 25-29
- Sato: 25-29
- Ishizaki: 25-29
- Mark: 25-29
- Fabian: 25-29
- Hirata: 25-29
- Enzo: 25-26
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Yoshioka (Toyama): 26,27,29
- Kozu (ICRR): ??
- Arai (ICRR):
- Travel (Week of 10/2):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/9/29(Fri)