Agenda/Minutes of the VIS Meeting on 2017/9/29

2017/9/29 13:30 -

Participants:

Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • PRM 3D CAD including the vacuum tank and inner frame is ready.

Plan for coming weeks

  • Check connection of PRM
  • Remove all the FC
  • PRM tuning (if possible)

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • I held a meeting to make estimates with several vendors.-->Price negotiation failed.Because the assumed price is too low(The estimate of the manufacturing cost of the chassis was higher than expected).

(Current assumed price about 900,000 yen -->Vendor's quotation price about 2,000,000 yen)

  • -->A different vendor submitted a quotation(It fits in the planned price). -->I also requested a new vendor to make a quote.

  • Waiting for concrete information on installation location.The type(High power,Low power)and number actually needed,and the peripheral equipment accompanying it.-->Placement plan for installing WDS in KAGRAJGW-E1707265(PDF).

Plan for coming weeks

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Ongoing(mechanical design).

  • Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

Other site works

  • BS duct connection: Oct 2 - 6
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Plan for the coming months

Travel Plans

  • Travel (Week of 10/2):
    • Takahashi: 2-6
    • Okutomi: 2-6
    • Sato: 2-6
    • Ishizaki: 2-6
    • Mark: 2-6
    • Fabian:
    • Hirata:
    • Enzo: 2-6
    • Shoda: 2-6
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 10/9):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/10/6(Fri)