Line 19: Line 19:

[X-end]

2nd(Mon)
  * Installed the pre-isolator into the top chamber.
  * Hooked the wire to the keystone in TF.
  * Removed the Wire holder.
3rd(Tue)
  * Installed two cross tubes to extend the ports for feedthrough.
  * Connected the cables to the feedthroughs.
  * Released the keystone in TF. All filter chain was suspended successfully.
  * Assembled the horizontal geophone.
5th(Thu)
  * The flange to partition the chamber to the corrugate tube and the cryostat was installed.
6th(Fri)
  * Adjusted the weight of DP.
  * Mounted the ballast rings on the IP.

[Y-end]

4th(Wed)
  * Opened the top chamber.
  * Locked the IP.
  * Checked the motion of FRs.
  * Found a mistake on the keystone of TF. It was locked.
  * The IRM of cryo-payload was touching the EQ stoppers.
  * Found over load for the BF. Weight of 2.4kg were removed from the cryo-payload so that the keystone of BF can be free.
5th(Thu)
  * The cryo-payload was dismounted by the CRY group.
  * Removed the wire and cables for cryo-payload from the BF.
  * Closed the top chamber.
Line 20: Line 52:
 * Tune the IP.
 * Set the BF damper.
Line 35: Line 69:
 *I held a meeting to make estimates with several vendors.-->I also requested a new vendor to make a quote(Waiting).

 *Waiting for concrete information on installation location.-->Waiting for further detailed placement information.

 *Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Mechanical design is completed.

 *Execution of the final version operation test for mass production ->Detailed exam(Ongoing).
Line 36: Line 78:
 *Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Start of machining for EX I/O box(19 inch chassis).

 *Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

Agenda/Minutes of the VIS Meeting on 2017/10/6

2017/10/6 13:30 -

Participants:

Progress report

Schedule Chart

Type-A & Bp : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

2nd(Mon)

  • Installed the pre-isolator into the top chamber.
  • Hooked the wire to the keystone in TF.
  • Removed the Wire holder.

3rd(Tue)

  • Installed two cross tubes to extend the ports for feedthrough.
  • Connected the cables to the feedthroughs.
  • Released the keystone in TF. All filter chain was suspended successfully.
  • Assembled the horizontal geophone.

5th(Thu)

  • The flange to partition the chamber to the corrugate tube and the cryostat was installed.

6th(Fri)

  • Adjusted the weight of DP.
  • Mounted the ballast rings on the IP.

[Y-end]

4th(Wed)

  • Opened the top chamber.
  • Locked the IP.
  • Checked the motion of FRs.
  • Found a mistake on the keystone of TF. It was locked.
  • The IRM of cryo-payload was touching the EQ stoppers.
  • Found over load for the BF. Weight of 2.4kg were removed from the cryo-payload so that the keystone of BF can be free.

5th(Thu)

  • The cryo-payload was dismounted by the CRY group.
  • Removed the wire and cables for cryo-payload from the BF.
  • Closed the top chamber.

Plan for coming weeks

  • Tune the IP.
  • Set the BF damper.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • I held a meeting to make estimates with several vendors.-->I also requested a new vendor to make a quote(Waiting).

  • Waiting for concrete information on installation location.-->Waiting for further detailed placement information.

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Mechanical design is completed.

  • Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

Plan for coming weeks

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->Start of machining for EX I/O box(19 inch chassis).

  • Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

Other site works

  • Center area will be a laser hazard area from Oct. 10
  • End of Aug. to Nov.: Mozumi entrance will be closed

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Plan for the coming months

Travel Plans

  • Travel (Week of 10/9):
    • Takahashi: 10-??
    • Okutomi: 10-??
    • Sato: 10-??
    • Ishizaki: 10-??
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): ??
    • Arai (ICRR): ??
  • Travel (Week of 10/16):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/10/13(Fri)