 * We had a big problem on k1pr0 after the blackout.
 * PR2 recovered smoothly.
 * Now PR3 is recovered after several problems.
  * TFs are checked. The suspension status looks good.

 * Problems to be solved:
  * large noise in PR2 OSEMs.
  * TF gain decrease by 30dB (Pr3 BF GAS)

Agenda/Minutes of the VIS Meeting on 2017/10/27

2017/10/27 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

  • Recovered the black out.
  • Checked signals for the BF damper.
  • Set the remote operation of the stepping motors.
  • Closed the top chamber.
  • Closed the cross tube.
  • Set the remote monitor of the vacuum gauge.

[Mitaka]

  • Assembled the BFs. One BF was completed. The other was assembled by a half.
  • Checked the ACCs. Two of six units have a problem.

Plan for coming weeks

  • Start evacuation in X-end.
  • Finish the assembly of BFs.
  • Service the ACCs.

[Plan in November]

  • 6-10 X-end: Disassembly of the EQ stop and the cabling.
  • 13-17 Transportation of the items from Akeno and Mitaka to the 2F in KAGRA.
  • 20-23 X-end: Reassembly of the EQ stop and the cabling.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • We had a big problem on k1pr0 after the blackout.
  • PR2 recovered smoothly.
  • Now PR3 is recovered after several problems.
    • TFs are checked. The suspension status looks good.
  • Problems to be solved:
    • large noise in PR2 OSEMs.
    • TF gain decrease by 30dB (Pr3 BF GAS)

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).-->

    • Wiring and Testing for EX I/O box(19 inch chassis) were completed.
    • Connection test with WDS and digital I/O card's emulation tool.
  • I held a meeting to make estimates with several vendors.-->

    • I got an estimate from the vendor(Denseisirius).
    • About 5.3 million yen.
  • Request for fabrication of JGW-D1605239(Binary IO Converter Chassis) for use with WDS(JGW-T1707285(docx)).-->Wait for results.

Plan for coming weeks

  • Execution of the final version operation test for mass production ->Detailed exam(Ongoing).

  • I want to start ordering mass production version.
  • I'd like to conduct the final exam in KAGRA.-->On the experiment plan at the KAGRA site of the WDS systemJGW-E1706737(PDF).

    • Experiments in phase 2 and phase 3(However,only one 4ch WDS main box is to be tested).
    • The target is a Low power type.
    • My desired test period is from 7th Nov to 9th Nov(6th Nov is move date and 10th Nov is preparation day).

Other site works

  • Fire drill: Nov. 16 from 11AM - 12AM
  • Commissioning Workshop: Nov. 27 to Dec. 1st

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Plan for the coming months

Travel Plans

  • Travel (Week of 10/30):
    • Takahashi:
    • Okutomi: 10/30 - 11/3
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 11/6):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/10/27(Fri)

KAGRA/Subgroups/VIS/VISMinutes20171027 (last edited 2017-10-27 15:37:18 by YoichiAso)