= Agenda/Minutes of the VIS Meeting on 2017/10/27 = 2017/10/27 13:30 - 15:00 Participants: Okutomi, Ishizaki, Aso, Mark, Sato, Hirata, Simon, Enzo, Fabian, Ohishi, Shoda, Tanaka == Progress report == === Schedule Chart === Type-A : ([[TBD|PDF]],[[TBD|MPP]]) Type-B: ([[TBD|PDF]],[[TBD|MPP]]) * Type-A: * Type-B: * Type-Bp: === Type-A (Takahashi) === ==== Past week report ==== [X-end] * Recovered the black out. * Checked signals for the BF damper. * Set the remote operation of the stepping motors. * Closed the top chamber. * Closed the cross tube. * Set the remote monitor of the vacuum gauge. [Mitaka] * Assembled the BFs. One BF was completed. The other was assembled by a half. * Checked the ACCs. Two of six units have a problem. ==== Plan for coming weeks ==== * Start evacuation in X-end. * Finish the assembly of BFs. * Service the ACCs. [Plan in November] * 11/6-10 X-end: Disassembly of the EQ stop and the cabling. * 11/13-17 Transportation of the items from Akeno and Mitaka to the 2F in KAGRA. * 11/20-12/1 X-end: Reassembly of the EQ stop and the cabling. === Type B (Mark) === ==== Past week report ==== At Kamioka (Mark, Fabian, Enzo, Hirata-san): * Hirata-san did an inventory of SR and other parts at Kamioka. * Mark and Enzo finalized the geometry matrices for the IP, entered them in MEDM and updated the safe.snap. * Mark, Enzo and Fabian worked with Izumi-san et al. to align the BS. We got the +Y beam fairly close to aligned (to the second gate valve, near IY). ==== Plan for week of 10/30 ==== Kamioka: Mark and Enzo * Continue alignment of BS. * Realign OL. * Work on servos. Mitaka: Fabian and Hirata-san * SR procurement. * New PI GAS FR design. * BS LBB ballast mass design. * SR cable lamp design. === Type-Bp (Shoda) === ==== Past week report ==== * We had a big problem on k1pr0 after the blackout. * PR2 recovered smoothly. * Now PR3 is recovered after several problems. * TFs are checked. The suspension status looks good. * Problems to be solved: * large noise in PR2 OSEMs. * TF gain decrease by 30dB (Pr3 BF GAS) ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Watchdog system (Tanaka) === ==== Past week report ==== *Creation of extended I/O PCB plot type (With the Main 4ch WDS box and I/O box,I/O board For relay).--> *Wiring and Testing for EX I/O box(19 inch chassis) were completed. *Connection test with WDS and digital I/O card's emulation tool. *I held a meeting to make estimates with several vendors.--> *I got an estimate from the vendor(Denseisirius). *About 5.3 million yen. *Request for fabrication of JGW-D1605239(Binary IO Converter Chassis) for use with WDS(JGW-T1707285(docx)).-->Wait for results. ==== Plan for coming weeks ==== *Execution of the final version operation test for mass production ->Detailed exam(Ongoing). *I want to start ordering mass production version. *I'd like to conduct the final exam in KAGRA.-->On the experiment plan at the KAGRA site of the WDS system[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0067/E1706737/001/Project%20WDS%20Experiment%20plan%20Drifts%20version%20170516.pdf|JGW-E1706737(PDF)]]. *Experiments in phase 2 and phase 3(However,only one 4ch WDS main box is to be tested). *The target is a Low power type. *My desired test period is from 7th Nov to 9th Nov(6th Nov is move date and 10th Nov is preparation day). === Other site works === * Fire drill: Nov. 16 from 11AM - 12AM * Commissioning Workshop: Nov. 27 to Dec. 1st === Safety === * Incidents: no * Foreseen risks * Type-A: vacuum evacuation * Type-B: possible crane work * Type-Bp: no work == Discussion == * Type-A accelerometers * We have only two spare accelerometers * These spare ones have different sensor heads. -> need to exchange the head when used. * We should consider restarting the collaboration with NIKHEF for the next generation of accelerometers. === Plan for the coming months === == Travel Plans == * Travel (Week of 10/30): * Takahashi: * Okutomi: 10/30 - 11/3 * Sato: * Ishizaki: * Mark: 10/30 - 11/2 * Fabian: * Hirata: * Enzo: 10/30 - 11/2 * Shoda: * Ohishi: * Fujii: * Tanaka: * Kozu (ICRR): * Arai (ICRR): * Travel (Week of 11/6): * Takahashi: * Okutomi: 6 - 10 * Sato: * Ishizaki: * Mark: * Fabian: * Hirata: * Enzo: * Shoda: 6 - 10 * Ohishi: * Fujii: * Tanaka: 6 - 10 * Kozu (ICRR): * Arai (ICRR): == Next meeting == On 2017/11/10(Fri)