the appointed date of delivery is March. * Checked [[drawings| https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7332]] of hanging jig. |
The appointed date of delivery is March 2018. * Checked [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7332| drawings]] of Type-C hanging jig. |
Line 51: | Line 51: |
* Check the parts and order missing parts of hanging jig. |
* Check the existing parts and order missing parts of hanging jig. * Check the drawings of glueing jig. |
Agenda/Minutes of the VIS Meeting on 2017/11/10
2017/11/10 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Started evacuation on 1st.
- Established remort control of the stepper motors.
- Adjusted DC position of the IP.
- Measured transfer functions.
[Mitaka]
- Finished asembly of the BFs.
- Assembled the FRs for SF.
- Checked the ACCs and the drivers. They can work.
Plan for coming weeks
- 11/13 Shipping in Akeno. Preparation for the center area.
- 11/14 Delivery in Kamika. Transortation of the bridge frame.
- 11/17 Lifting of the items by MESCO.
- 11/15-17 Replacement of cables in X-end.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- Ordered 3 High Power Coil Drivers and 1 satellite box to AEL group.
- The appointed date of delivery is March 2018.
Checked drawings of Type-C hanging jig.
Plan for coming weeks
- Check the existing parts and order missing parts of hanging jig.
- Check the drawings of glueing jig.
Watchdog system (Tanaka)
Past week report
*I want to start ordering mass production version.-->Waiting.
*Execution of the final version operation test for mass production -->Completed(Clear all operation test).
*Experiments in phase 2 and phase 3(However,only one 4ch WDS main box is to be tested).-->Waiting(Changing travel schedule).
*Designing and manufacturing testing tools for mass production equipment.-->Completed.
Plan for coming weeks
*Star of order related works.
*Operation test of the testing tool for mass production equipment.
*Business trip plan.--> I stay at Toyama on the 19th.And experiment in Kamioka from 20th to 22nd.
Other site works
- In the week of Nov. 13th: Fixing the water leaks around the BS area.
- Fire drill: Nov. 16 from 11AM - 12AM
- Commissioning Workshop: Nov. 27 to Dec. 1st
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Plan for the coming months
Travel Plans
- Travel (Week of 11/13):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/20):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/11/17(Fri)