Agenda/Minutes of the VIS Meeting on 2017/11/17
2017/11/17 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
[X-end]
- Started the replacement of cables from 15th.
- Dismounted the pre-isolator.
- Removed the cables above the F1.
- Removed some screws from the inside of F1.
[ITM]
- The items from Akeno and Mitaka were delivered on 14th.
- Transported the bridge frame from the X-end to the center area on 14th.
- Lifting up the items to the 2nd floor by MESCO on 17th.
Plan for coming weeks
- X-end: Reassembly of the EQ stop and the cabling from 20th.
- Y-end: Connection to the cryo-payload from 27th.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- Checked and ordered missing parts of hanging jig.
- looking for assembly manual.
- Checked glueing jig parts.
Plan for coming weeks
- Order some glueing jig parts that have defect.
- Revise Type-C assembly manual.
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Crane inspection: Nov. 22 11:30 - 12:30
- Commissioning Workshop: Nov. 27 to Dec. 1st
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Plan for the coming months
Travel Plans
- Travel (Week of 11/20):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/27):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2017/11/24(Fri)