Differences between revisions 3 and 5 (spanning 2 versions)
Revision 3 as of 2017-11-17 13:30:04
Size: 2189
Editor: NaokoOhishi
Comment:
Revision 5 as of 2017-11-17 13:35:32
Size: 2295
Editor: NaokoOhishi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 46: Line 46:
 * looking for assembly manual.
Line 49: Line 48:
 * Order some glueing jig parts that have some defects.  * Order some glueing jig parts that have defect.
 * Revise Type-C assembly [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/IMC%20Suspension?action=AttachFile&do=view&target=sus2_02_v2.pdf|manual]].

Agenda/Minutes of the VIS Meeting on 2017/11/17

2017/11/17 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:
  • Type-Bp:

Type-A (Takahashi)

Past week report

[X-end]

  • Started the replacement of cables from 15th.
  • Dismounted the pre-isolator.
  • Removed the cables above the F1.
  • Removed some screws from the inside of F1.

[ITM]

  • The items from Akeno and Mitaka were delivered on 14th.
  • Transported the bridge frame from the X-end to the center area on 14th.
  • Lifting up the items to the 2nd floor by MESCO on 17th.

Plan for coming weeks

  • X-end: Reassembly of the EQ stop and the cabling from 20th.
  • Y-end: Connection to the cryo-payload from 27th.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Checked and ordered missing parts of hanging jig.
  • Checked glueing jig parts.

Plan for coming weeks

  • Order some glueing jig parts that have defect.
  • Revise Type-C assembly manual.

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Crane inspection: Nov. 22 11:30 - 12:30
  • Commissioning Workshop: Nov. 27 to Dec. 1st

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Plan for the coming months

Travel Plans

  • Travel (Week of 11/20):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 11/27):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/11/24(Fri)

KAGRA/Subgroups/VIS/VISMinutes20171117 (last edited 2017-11-24 11:11:20 by MarkBarton)