Line 34: Line 34:
   *Plan the operation test again at KAGRA-->
          *DC power problem. —>Solved.(AC GND is different at KAGRA and Mitaka.)

          * Actual test of WD operation(Retest).—>Succeed.
               *Coil driver out —> WDS operated.
               *Real oscillation of IM2 . —>Real signal of the OSEM detected, and WDS operated.
    
    * Layout plan of this physical year(2017)checked.—>
         * Short type(about 1 - 2 m) of DC cable(For 18V) needs 16 cables.
         *Need machine time —> WDS operating levels are decisioned by real experiments.
   
Line 35: Line 47:
      *Start ordering mass production version.-->Ongoing(Formal request for quotation from the vendors).
   *Waiting for arrival of mailing(by paper quotation).
             *Start other ordering.

Agenda/Minutes of the VIS Meeting on 2017/12/15

2017/12/15 15:00 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Plan the operation test again at KAGRA-->

    • DC power problem. —>Solved.(AC GND is different at KAGRA and Mitaka.)

    • Actual test of WD operation(Retest).—>Succeed.

      • Coil driver out —> WDS operated.

      • Real oscillation of IM2 . —>Real signal of the OSEM detected, and WDS operated.

    • Layout plan of this physical year(2017)checked.—>

      • Short type(about 1 - 2 m) of DC cable(For 18V) needs 16 cables.
      • Need machine time —> WDS operating levels are decisioned by real experiments.

Plan for coming weeks

  • Start ordering mass production version.-->Ongoing(Formal request for quotation from the vendors).

    • Waiting for arrival of mailing(by paper quotation).
      • Start other ordering.

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 12/18):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/25):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):