Differences between revisions 3 and 4
Revision 3 as of 2017-12-15 10:57:21
Size: 2921
Comment:
Revision 4 as of 2017-12-15 10:58:03
Size: 2918
Comment:
Deletions are marked like this. Additions are marked like this.
Line 68: Line 68:
    *Start other ordering.           *Start other ordering.

Agenda/Minutes of the VIS Meeting on 2017/12/15

2017/12/15 15:00 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF,MPP)

Type-B: (PDF,MPP)

  • Type-A:
  • Type-B:

Type-A (Takahashi)

Past week report

[X-end]

  • Checked the ACCs with the drivers. The problem in cabling was not settled. We go to use the geophones as inertial sensors.
  • Started preparation for the geophones.
  • Made cables for the temperature monitor.

[Y-end]

  • Tested the yaw picomoter in BF. The picomoter can work to align the cryo-payload, but the response was not smooth.
  • Tested the FR in BF. The screw shaft was jammed due to the miss operation caused by power drop of the power supply.

[Front]

  • Started the preparation for installation.
  • Arranged the items in the 2F.
  • Checked delivered EQ stops.

Plan for coming weeks

  • X-end: Install the geophones. Close the chambers.
  • Y-end: Repair the jamming of FR. Align the cryo-payload. Close the chambers.
  • X-front: Preparation.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Plan the operation test again at KAGRA-->

    • DC power problem. —>Solved.(AC GND is different at KAGRA and Mitaka.)

    • Actual test of WD operation(Retest).—>Succeed.

      • Coil driver out —> WDS operated.

      • Real oscillation of IM2 . —>Real signal of the OSEM detected, and WDS operated.

    • Layout plan of this physical year(2017)checked.—>

      • Short type(about 1 - 2 m) of DC cable(For 18V) needs 16 cables.
      • Need machine time —> WDS operating levels are decisioned by real experiments.

Plan for coming weeks

  • Start ordering mass production version.-->Ongoing(Formal request for quotation from the vendors).

    • Waiting for arrival of mailing(by paper quotation).
    • Start other ordering.

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 12/18):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 12/25):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2017/12/22(Fri)

KAGRA/Subgroups/VIS/VISMinutes20171215 (last edited 2017-12-15 16:16:35 by MarkBarton)