Agenda/Minutes of the VIS Meeting on 2018/1/12
2018/1/12 13:30 -
Participants:
Progress report
Schedule Chart
- Type-A:
- Type-B:
Type-A (Takahashi)
Past week report
[X-end]
- Replaced the vacuum gauge.
- Connected the PT100 sensor to the monitor.
- Fastened the top chamber and the hatch on the cross tube.
- Started evacuation of EXV chamber on the 28th in Dec. The present pressure is 78Pa.
- Transported the items to the center room (footholds, workbench, chain bolocks, tools, etc.)
[Y-end]
- Transported the dummy payload to the center room.
[X-front]
- Lifted up the items from the X/Y-end.
Plan for coming weeks
- The evacuation of EYV chamber will be started in the 19th morning.
- The short rod for DP is missing.
- The assembly of pre-isolaor for SRM is planed.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Parking space
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Commissioning support
- Lab. temperature
Travel Plans
- Travel (Week of 1/15):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 1/22):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/1/19(Fri)