= Agenda/Minutes of the VIS Meeting on 2018/2/2 = 2018/2/2 13:30 - 14:40 Participants: Mark, Takahashi, Sato, Aso, Hirata, Tanaka, Fabian, Shoda, Ishizaki, Suzuki == Progress report == === Schedule Chart === Type-A : ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7320|PDF/MPP]]) Type-B: ([[TBD|PDF]],[[TBD|MPP]]) * Type-A: 0.5 week delay expected for BF * Type-B: === Type-A (Takahashi) === ==== Past week report ==== [X-front] * Assembled the side stoppers for DP and BF. * Assembled the LVDT coils for BF damper. The primary coils were attached on the cup. * Measured the weight of BF (105 kg). * Put the BF base onto the end plate and hooked the test wire to the receptacle. * Tuned the BF with additional compression (load 190.4kg, frequency 0.3Hz). * '''Check with CRY if 190kg is OK for CRY payload (Takahashi)''' * Checked the range of FR in the BF. The range was larger than the movable limit of keystone. * Checked the blades on TFs. There were not any cracks on the surface of the blades. [Y-end] * Release the support jack for the top chamber. The height of chamber was decreased by 2mm. * Removed the NIM chassis from the rack. ==== Plan for coming weeks ==== * Open the top chamber and the cross tube. * Install the DP and the BF into the chamber. === Type B (Mark) === ==== Report for week of 1/29 ==== * We moved the top filter intended for SR2 (#1) into the SR3 cleanbooth. * Unfortunately we noticed one of the blades had many small X-shaped stress fractures on the top surface (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4058|4058]]). * We moved the top filter entered for SR3 (#3) into the SRM cleanbooth and inspected the blades. Two had one smallish stress fracture each and one had a huge fracture and looks close to failing (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4061|4061]]). * We referred the BS OL. * We removed the BS tank lid and inspected the BS top filter blades. They seemed fine (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4073|4073]]). * Hirata-san received and washed some ferromagnetic disks for IM flags and other small parts. * Hirata-san moved the BF with the tilted keystone (#1) out of the cleanbooth in preparation for rebuilding. * Hirata-san placed the second order for payload parts, and an order for remachining of nuts for cable clamps on rods. * Fabian measured the gain of the ADC system (homework from the Commissioning Workshop). * Shoda-san revised the BS real-time model (and Izumi-san fixed a few compile errors and installed it). ==== Plan for week of 2/5 ==== * Enzo on vacation; all others at Kamioka. * - * Make in-air pico adapter cables. * Calibrate LVDT. * Test IM picos and BF yaw pico. * Test FR. * Install ballast mass in BF. * Build IRM around IM. ==== Plan for week of 2/13 ==== * No work Monday (建国記念の日の振替休日)<
> * Enzo on vacation * Hirata-san at Mitaka Tue, Wed (to receive and wash parts). * All others at Kamioka. * - * Cable/test/adjust IM OSEMs. * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw. ==== Plan for week of 2/19 ==== * Lift BF/... section and check total mass and balance. * Cable and test BF picos. * Add section of SS up to SF ring. * Bring in SF. * Add Cu segments to SF cap. * Hook BF/... section. * Route cables up to under SF. * Check/adjust total mass of BF/... section. ==== Vacation Info ==== * Enzo 1/30-2/19 (at Mitaka 1/29, part of 1/30). * Fabian 4/2-4/27 vacation (then gone). === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === Watchdog system (Tanaka) === ==== Past week report ==== *Preparation for assembly of mass products. --> Ongoing. *Adjustment and approval to vendors(Meeting on machine design etc). --> Completed. ==== Plan for coming weeks ==== *Preparation for assembly of mass products. *Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.). === Other site works === * Feb 18: Black out of the Mozumi buildings === Safety === * Incidents: no incident * Foreseen risks * Type-A: Crane work * Type-B: Crane work * Type-Bp: == Discussion == * Fragile blades * All the SR TF blades are bad -> we will replace them * BS and ITM TF blades seem to be OK (no crack found) * Takahashi will ask G&M the history of those blades (is there any difference between the SR blades and others ?) * For ITM TF, we do not have enough number of blades from the beginning. We need at least 3 more blades. * We will make the following numbers of blades: * SR: 15 (9 necessary) * BS: 6 (3 necessary if we replace them) * Type-A: 6 (3 necessary) * How to safely take out the damaged blades from the TFs ? * We need to wear protective gear (Aso will look for them) * We will clamp the blade (using C-clamps) to the jig around the large crack to prevent sudden break. Hirata will select suitable C-clamps. * Once the blades are moved to the work bench, we will cover everything in a plastic box before releasing the stress. == Travel Plans == * Travel (Week of 2/5): * Takahashi: 7-9 * Okutomi: 5 - 9 * Sato: 6-9 * Ishizaki: 7-9 * Mark: 5-9 * Fabian: 5-9 * Hirata: 5-9 * Enzo: * Shoda: * Ohishi: * Fujii: * Tanaka: * Kozu (ICRR): 5-9 * Arai (ICRR): * Travel (Week of 2/12): * Takahashi: 13-16 * Okutomi: 13-16 * Sato: 13-16 * Ishizaki: 13-16 * Mark: 13-16 * Fabian: 13-16 * Hirata: 15-16 * Enzo: * Shoda: * Ohishi: * Fujii: * Tanaka: * Kozu (ICRR): 13-16 * Arai (ICRR): == Next meeting == On 2018/2/9(Fri)