Agenda/Minutes of the VIS Meeting on 2018/2/9

2018/2/9 13:30 - 15:00

Participants: Mark, Hirata, Fabian, Izhizaki, Aso, Takahashi, Ohishi, Shoda, Tanaka, Sato, Okutomi, Akutsu

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • The delivery of the maraging rod was deley. We didn't go to hunging by the short rod.
  • Attached magnets to the primary coils and made interconnect cables.
  • Installed the protection net into the cross tube.
  • Opened the top chamber.
  • Installed the frame lock.
  • Attached the corn bellows onto the bottom of top chamber.
  • Assembling the side stoppers for SFs.
  • The optimal load of BF (190kg) is not acceptable for the cryo-payload. Designing an additional FR.

[X-end]

  • Attached the additional vacuum gauge to the top chamber. The pressure was 0.16Pa.
  • Checked the connection for LVDT on the F0-BF.

[Y-end]

  • The position of IP was corrected so that the torsion mode frequency can be the lowest.
  • Started the cool down of EYC cryostat on 7th.

[Broken blades]

  • Franco reported about the sample of broken blades. The sample has two different zones.
  • Checked dimensions of some blades. The width was the same, but the thickness was different.
  • Dismounted the blade for SRM from the arc jig.
  • Nikhef can investigate the broken blade too.
  • No information from the maker.
  • Asking the companies about the optimal thickness as material for new blades.

Plan for coming weeks

  • Hung the DP by the short rod.
  • Attached the additional FR and tune the BF again.

Type B (Mark)

Report for week of 1/29

  • Mark made two sets of in-air pico splitter cables (each with a triple for IM and a double for BF) for SR2 and SR3.
  • Fabian, Hirata-san and Kozu-kun worked on cabling and testing the IM pitch/roll/yaw picos, the BF FR and the BF LVDT. The LVDT connections were initially unreliable and Hirata-san had to redo the pins on the coil wires.
  • Fabian installed ballast masses in the BF.
  • Mark worked on schedule.
  • Mark did inventory of the stepper motor drivers (many were not accounted for on the wiki and/or JGWDoc and one is missing) and reserved two for SR3.
  • We emptied out the external cleanroom in preparation for installing SS sheet.

Plan for week of 2/13

  • No work Monday (建国記念の日の振替休日)
  • Enzo on vacation
  • Hirata-san at Mitaka Tue (self-evaluation interview).
  • Shoda-san at Mitaka.
  • All others at Kamioka.
  • -
  • Build IRM around IM.
  • Cable/test/adjust IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Send OSEM parts back to Mitaka so that Shoda-san can assemble them in Mitaka.

Plan for week of 2/19

  • Enzo back from Tuesday.
  • Shoda-san at Mitaka.
  • Hirata-san at Mitaka Mon+Tue (to receive and wash parts).
  • All others at Kamioka.
  • -
  • Lift BF/... section and check total mass and balance.
  • Cable and test BF picos.
  • Add section of SS up to SF ring.
  • Bring in SF.
  • Hook BF/... section.
  • Route cables up to under SF.
  • Check/adjust total mass of BF/... section.

Plan for week of 2/26

  • Shoda-san at Mitaka.
  • -
  • Add Cu segments to SF cap.
  • Lift SF/... section and check total mass and balance.

Vacation Info

  • Enzo 1/30-2/19.
  • Fabian 4/2-4/27 vacation (then gone).

Type-Bp (Shoda)

Past week report

  • Simon and Arai-kun have set up length Oplev for PRM.

Plan for coming weeks

  • Arai-kin, Miyo-kun, and Ohishi-san(?) will close the tank of PRM in order to release SF GAS.

OMMT & OSTM (Ohishi)

Past week report

  • Ordered 4 custom-made small bellows for vertical vibration isolation.
  • Some drawings of the hanging jig parts were not updated.
    • need to reorder some mechanical parts.

Plan for coming weeks

  • OSEM test

Watchdog system (Tanaka)

Past week report

  • Preparation for assembly of mass products.-->Ongoing.

  • Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->Ongoing.

    • The scheduled delivery date is 22th Feb(final).-->Adjusting.

Plan for coming weeks

  • Preparation for assembly of mass products.
  • Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)

Other site works

  • Feb 18: Black out of the Mozumi buildings
  • 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness)
  • 3/12 - 3/16 Installation of the control systems for the large GVs

Safety

  • Incidents: no incident
  • Foreseen risks
    • Type-A: Crane works
    • Type-B: No crane work foreseen
    • Type-Bp: Crane works

Discussion

  • Next FY budget
    • OMMT+OSTM: 14,000KJPY
    • TF(SR, BS, Type-A) replacement blades: 5,000KJPY
    • TF Yaw fishing rod modification: 300KJPY
    • Type-A fishing rod CuBe blades: 100KJPY

    • Mirror disassembly jig for BS: 300KJPY
    • Damper ring for SR: 4,000KJPY (2 sets)
    • SR ballast masses: 1,500KJPY
    • In-Vacuum Cable Assembly: 400KJPY
    • ETM PI Geophones: 3,000KJPY (6sets including pods)
    • Maraging rods: 2MJPY (For Type-A and B SF Damper rings. 12 rods)
    • Feedthrough: 3MJPY (11 more need to be purchased.)

Travel Plans

  • Travel (Week of 2/12):
    • Takahashi: 13-16
    • Okutomi: 13-16
    • Sato: 13-16
    • Ishizaki: 13-16
    • Mark: 13-16
    • Fabian: 13-16
    • Hirata: 14-16
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 13-16
    • Arai (ICRR): 13-16
  • Travel (Week of 2/19):
    • Takahashi: 19 - 23
    • Okutomi: 19 - 23
    • Sato: 19 - 23
    • Ishizaki: 19 - 23
    • Mark: 19 - 23
    • Fabian: 19 - 23
    • Hirata: 21 - 23
    • Enzo: 20 - 23
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 19 - 23
    • Arai (ICRR):

Next meeting

On 2018/2/16(Fri)