Agenda/Minutes of the VIS Meeting on 2018/2/9
2018/2/9 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
- Type-A:
- Type-B:
Type-A (Takahashi)
Past week report
[X-front]
- The delivery of the maraging rod was deley. We didn't go to hunging by the short rod.
- Attached magnets to the primary coils and made interconnect cables.
- Installed the protection net into the cross tube.
- Opened the top chamber.
- Installed the frame lock.
- Attached the corn bellows onto the bottom of top chamber.
- Assembling the side stoppers for SFs.
- The optimal load of BF (190kg) is not acceptable for the cryo-payload. Designing an additional FR.
[X-end]
- Attached the additional vacuum gauge to the top chamber. The pressure was 0.16Pa.
- Checked the connection for LVDT on the F0-BF.
[Y-end]
- The position of IP was corrected so that the torsion mode frequency can be the lowest.
- Started the cool down of EYC cryostat on 7th.
[Broken blades]
- Franco reported about the sample of broken blades. The sample has two different zones.
- Checked dimensions of some blades. The width was the same, but the thickness was different.
- Dismounted the blade for SRM from the arc jig.
- Nikhef can investigate the broken blade too.
- No information from the maker.
- Asking the companies about the optimal thickness as material for new blades.
Plan for coming weeks
- Hung the DP by the short rod.
- Attached the additional FR and tune the BF again.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- Simon and Arai-kun have set up length Oplev for PRM.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- Ordered 4 custom-made small bellows for vertical vibration isolation.
- Some drawings of the hanging jig parts were not updated.
- need to reorder some mechanical parts.
Plan for coming weeks
- OSEM test
Watchdog system (Tanaka)
Past week report
Preparation for assembly of mass products.-->Ongoing.
Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->Ongoing.
The scheduled delivery date is 22th Feb(final).-->Adjusting.
Plan for coming weeks
- Preparation for assembly of mass products.
- Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)
Other site works
- Feb 18: Black out of the Mozumi buildings
- 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness)
- 3/12 - 3/16 Installation of the control systems for the large GVs
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Next FY budget
Travel Plans
- Travel (Week of 2/12):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 2/19):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/2/16(Fri)