Line 15: Line 15:

[X-front]
 * Put the BF onto the end plate inserting the suspension wire for DP.
 * Installed the EQ stop with the BF and the DP into the top chamber.
 * Adjusted the height of release sensors for the DP.
 * Installed the F3 into the clean booth.
 * Assembled the release sensors, the side stoppers, the FR, and the connector plates for the F3.
 * Replaced the receptacles for wires in the F3.
 * Cabled the release sensors, the LVDT, the actuator, and the stepping motor in the F3.
 * Checked the additional FR blade for the BF. It can pull up the 8kg weight.
 * Calibrated the LVDT in the BF. Adjusted the height of secondary coil.
 * Repairing the side stoppers.

[Broken blades]
 * Sent a sample of the broken blade to Nikhef.
 * Rolling process for new blades was suggested. It will take two months.
 1. Cutting the black skin: 53t --> 50t
 2. Hot roll: 50t --> 8.0t
 3. Cold roll: 8.0t --> 6.5t
 4. Fine roll: 6.5t --> 5.0t
 
Line 16: Line 37:
 * Attach the additional FR and tune the BF again.
 * Extend the EQ stop to the F3 stage.
 * Tune the F3.
 * Cable between the BF and the F3.

Agenda/Minutes of the VIS Meeting on 2018/2/16

2018/2/16 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • Put the BF onto the end plate inserting the suspension wire for DP.
  • Installed the EQ stop with the BF and the DP into the top chamber.
  • Adjusted the height of release sensors for the DP.
  • Installed the F3 into the clean booth.
  • Assembled the release sensors, the side stoppers, the FR, and the connector plates for the F3.
  • Replaced the receptacles for wires in the F3.
  • Cabled the release sensors, the LVDT, the actuator, and the stepping motor in the F3.
  • Checked the additional FR blade for the BF. It can pull up the 8kg weight.
  • Calibrated the LVDT in the BF. Adjusted the height of secondary coil.
  • Repairing the side stoppers.

[Broken blades]

  • Sent a sample of the broken blade to Nikhef.
  • Rolling process for new blades was suggested. It will take two months.
  • Cutting the black skin: 53t --> 50t

  • Hot roll: 50t --> 8.0t

  • Cold roll: 8.0t --> 6.5t

  • Fine roll: 6.5t --> 5.0t

Plan for coming weeks

  • Attach the additional FR and tune the BF again.
  • Extend the EQ stop to the F3 stage.
  • Tune the F3.
  • Cable between the BF and the F3.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Preparation for assembly of mass products.-->Ongoing.

  • Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->Ongoing.

Plan for coming weeks

  • Preparation for assembly of mass products.
  • Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)

Other site works

  • Feb 18: Black out of the Mozumi buildings
  • 2/21 : Monthly crane inspection 11:30 - 12:30
  • 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness)
  • 3/12 - 3/16 Installation of the control systems for the large GVs

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Analog electronics management
  • Mechanical update history

Travel Plans

  • Travel (Week of 2/19):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 2/26):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Fabian:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/2/23(Fri)