*Preparation for assembly of mass products.-->Ongoing. *Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)--> *Delivered( 5 of 6 substrates and Cables(assembled)). *There are two casings yet(Adjusting with vendor) *Operation test of the initial product is completed. And I ordered the production of the residual mass-produced products.-->Pending delivery. |
|
Line 32: | Line 39: |
*Preparation for assembly of mass products.--> *Programming and Unit Testing(59 Items) *Other necessary preparations. *Adjustment and approval to vendors(Negotiating to guarantee machining delay of cases). |
|
Line 50: | Line 62: |
* Securing cables | |
Line 52: | Line 65: |
Agenda/Minutes of the VIS Meeting on 2018/3/2
2018/3/2 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Preparation for assembly of mass products.-->Ongoing.
Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->
- Delivered( 5 of 6 substrates and Cables(assembled)).
- There are two casings yet(Adjusting with vendor)
Operation test of the initial product is completed. And I ordered the production of the residual mass-produced products.-->Pending delivery.
Plan for coming weeks
Preparation for assembly of mass products.-->
- Programming and Unit Testing(59 Items)
- Other necessary preparations.
- Adjustment and approval to vendors(Negotiating to guarantee machining delay of cases).
Other site works
- 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness)
- 3/12 - 3/16 Installation of the control systems for the large GVs
- 3/12 - Center area: preparation for pump down: connecting ducts.
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Center area pump down
- Vacuum flange status
- Securing cables
OpLev monitoring
- Drift monitoring during pump down
- Phase 1 operation measurements
- Minimum success criteria for each measurement
- Who will do the task
Travel Plans
- Travel (Week of 3/5):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 3/12):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/3/9(Fri)
VIS Meeting in Mitaka: 3/16