2018/3/2 13:30 -

Participants:
2018/3/2 13:30 - 15:40

Participants: Fabian, Takahashi, Aso, Tanaka, Enzo, Okutomi, Hirata, Mark, Shoda, Ishizaki
Line 135: Line 135:
 * Incidents:  * Incidents: no incident
Line 138: Line 138:
  * Type-A:
  * Type-B:
  * Type-A: Crane work
  * Type-B: Crane work, working with springs
Line 143: Line 143:
 * Center area pump down
  * Vacuum flange status

=== Center area pump down ===
==== Vacuum flange status ====
 * BS
  * Top flange: O-ring inside, but covered with mending tapes (not vacuum compatible)
  * Small service flanges in the bottom section near the top flange (2 of them): Opened once. Not tightened. Maybe no O-ring.
  * Feed through flanges: Metal gaskets inside. Not tightened.
  * A blank flange in place of a feed through flange: Maybe no O-ring. Not tightened.
 * PRM
  * Top flange: No O-ring
  * Feedthrough flanges: Metal gaskets inside. Not tightened.
 * PR2/PR3
  * Top flange: O-ring inside. Not tightened. To be tightened by Futaba in the week of Mar. 5th.
  * Feedthrough flanges: Metal gaskets inside. Not tightened.


Agenda/Minutes of the VIS Meeting on 2018/3/2

2018/3/2 13:30 - 15:40

Participants: Fabian, Takahashi, Aso, Tanaka, Enzo, Okutomi, Hirata, Mark, Shoda, Ishizaki

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • Finished the cabling between the BF and F3.
  • Tuned the F3 again with hanging the F3 by crane.
  • Final optimal load was additionally 1.2kg at 0.25Hz.
  • Removed the primary coils for the BF damper.
  • Checked cable connections and repaired some disconnections.
  • Started the installation of F2. Assembled the FR in the F2.

Plan for coming weeks

[X-front]

  • Measure the transfer functions of the BF and the F3.
  • Lift down the BF into the corrugate tube.
  • Extend the EQ stop for the F2.

[X-end]

  • Vent the chamber on 5th.
  • Remove the DP on 6th.
  • Install the maraging wire for Cryo-payload with cables on 7th.

Type B (Mark)

Report for week of 2/26

  • We routed all the cables from the BF level up via the flying saucer to the SF.
  • Hirata-san tried filing the SF cap to improve the fit, but without much success.
  • Hirata-san installed the Cu segments and cable clamps on the SF cap and the SF LVDT and FR cables.
  • We cabled and tested the BF cap picos and the SF LVDT and FR. (The LVDT still needs a full calibration.)
  • We worked on recovering the IM OSEM alignment.

Plan for week of 3/5

  • Shoda-san at Mitaka.
  • Hirata-san vacation Mon 3/5, then Kamioka
  • Fabian Mitaka Mon-Tue (COMSOL training), Kamioka Wed-Fri.
  • Others at Kamioka.
  • -
  • Remove LBB temporary ballast masses from BS chamber.

  • Finish recovering IM OSEM alignment.
  • Calibrate SF LVDT.
  • Lift SF/... section and check total mass and balance.
  • Get SRM tank mushroom section installed (Hirata-san, Kimura-san)
  • Set up for rebuilding of two BFs.

Plan for week of 3/12

  • Shoda-san at Mitaka.
  • Mark at ASJ (Chiba) Fri, then Mitaka.
  • Hirata-san vacation Mon 3/5; Kamioka Tue-Thu; Mitaka Fri
  • Others Kamioka Mon-Thu
  • Install boxes in SR3 and SRM racks.
  • Lay SR3 in-air cabling.
  • Continue rebuild of BFs.

Plan for week of 3/19

  • Mark at LVC meeting
  • All others at Mitaka
  • Make two sets of IM OSEMs
  • Make last in-air pico adapter cable
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM.
  • Set up Dummy BS prism removal.

Plan for week of 3/26

  • Mark vacation.
  • Shoda-san at Mitaka
  • Others at Kamioka
  • --
  • F0 Prototype Blade Test
    • Characterize blades.
    • Choose best set of three.
    • Remove cracked blades from filter in SRM area.
    • Set up test weights in SRM area, first floor.
    • Remove floor panel in SRM area, second floor.
    • Install chosen blades.
    • Measure load capacity.

To-Do Lists, Schedule

Vacation Info

  • Mark at LVC, then vacation, 3/18 (Sun) - 4/1 (Sun)
  • Hirata-san vacation, Mon 3/5.
  • Fabian vacation, 3/26-4/27 (then gone).

Type-Bp (Shoda)

Past week report

  • Takahashi-san, Aso-san, Ohishi-san, and Miyo-kun checked the suspension height. But the height was not much changed. So SF weight was not changed. I checked the LVDT trend since the installation. There are some jumps after data taking errors, including blackouts. Details will be uploaded to klog later.
  • I prepared IP stepping motor med scripts. Actuation check is required.
  • PRM guardian has an error that I could not solve.

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Preparation for assembly of mass products.-->Ongoing.

  • Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->

    • Delivered( 5 of 6 substrates and Cables(assembled)).
    • There are two casings yet(Adjusting with vendor)
    • Operation test of the initial product is completed. And I ordered the production of the residual mass-produced products.-->Pending delivery.

Plan for coming weeks

  • Preparation for assembly of mass products.-->

    • Programming and Unit Testing(59 Items)
    • Other necessary preparations.
  • Adjustment and approval to vendors(Negotiating to guarantee machining delay of cases).

Other site works

  • 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness) *3/8 or 3/9 no car in the access tunnel
  • 3/12 - 3/16 Installation of the control systems for the large GVs
  • 3/12 - Center area: preparation for pump down: connecting ducts.

Safety

  • Incidents: no incident
  • Foreseen risks
    • Type-A: Crane work
    • Type-B: Crane work, working with springs
    • Type-Bp:

Discussion

Center area pump down

Vacuum flange status

  • BS
    • Top flange: O-ring inside, but covered with mending tapes (not vacuum compatible)
    • Small service flanges in the bottom section near the top flange (2 of them): Opened once. Not tightened. Maybe no O-ring.
    • Feed through flanges: Metal gaskets inside. Not tightened.
    • A blank flange in place of a feed through flange: Maybe no O-ring. Not tightened.
  • PRM
    • Top flange: No O-ring
    • Feedthrough flanges: Metal gaskets inside. Not tightened.
  • PR2/PR3
    • Top flange: O-ring inside. Not tightened. To be tightened by Futaba in the week of Mar. 5th.
    • Feedthrough flanges: Metal gaskets inside. Not tightened.
    • Securing cables
    • OpLev monitoring

    • Drift monitoring during pump down
  • Phase 1 operation measurements
    • Minimum success criteria for each measurement
    • Who will do the task

Travel Plans

  • Travel (Week of 3/5):
    • Takahashi: 5-9
    • Okutomi: 5-8
    • Sato: 5-9
    • Ishizaki: 5-9
    • Mark: 5-9
    • Fabian: 7-9
    • Hirata: 6-9
    • Enzo: 5-9
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 5-9
    • Arai (ICRR):
  • Travel (Week of 3/12):
    • Takahashi: 13 - 15
    • Okutomi: 12 - 15
    • Sato: 12 - 15
    • Ishizaki: 12 - 15
    • Mark: 12 - 15
    • Fabian: 12 - 15
    • Hirata: 12 - 15
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanaka:
    • Kozu (ICRR): 12 - 15
    • Arai (ICRR):

Next meeting

On 2018/3/9(Fri)

VIS Meeting in Mitaka: 3/16