⇤ ← Revision 1 as of 2018-03-28 13:23:00
Size: 1458
Comment:
|
Size: 1955
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 31: | Line 31: |
*Business trip plan *March 25(Toyama),26th-29th(Kamioka),30th(Preliminary day Toyama->Tokyo) *Installation place-->PRM,PR3,PR2,BS,SR2(However,only to install. Launch is done on another occasion.) —>Completed *Prepare necessary documents —> JGW-S1808015,S1808016,S1808017,S1808021,S1808022,S1808010,S1808011,S1808012 |
|
Line 32: | Line 42: |
*Next install plan *I plan to install SR3 and SRM after completion of installation. *Actual launch is scheduled for May or later. |
Agenda/Minutes of the VIS Meeting on 2018/3/30
2018/3/30 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
- Business trip plan
March 25(Toyama),26th-29th(Kamioka),30th(Preliminary day Toyama->Tokyo)
Installation place-->PRM,PR3,PR2,BS,SR2(However,only to install. Launch is done on another occasion.)
—>Completed
Prepare necessary documents —>
- JGW-S1808015,S1808016,S1808017,S1808021,S1808022,S1808010,S1808011,S1808012
Plan for coming weeks
- Next install plan
- I plan to install SR3 and SRM after completion of installation.
- Actual launch is scheduled for May or later.
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/2):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 4/9):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/4/6(Fri)