Differences between revisions 1 and 2
Revision 1 as of 2018-03-28 13:23:00
Size: 1458
Editor: YoichiAso
Comment:
Revision 2 as of 2018-03-30 11:54:19
Size: 1955
Comment:
Deletions are marked like this. Additions are marked like this.
Line 31: Line 31:
 *Business trip plan
     *March 25(Toyama),26th-29th(Kamioka),30th(Preliminary day Toyama->Tokyo)

 *Installation place-->PRM,PR3,PR2,BS,SR2(However,only to install. Launch is done on another occasion.)
      —>Completed

 *Prepare necessary documents —>
  JGW-S1808015,S1808016,S1808017,S1808021,S1808022,S1808010,S1808011,S1808012

Line 32: Line 42:

 *Next install plan

  *I plan to install SR3 and SRM after completion of installation.
  
  *Actual launch is scheduled for May or later.

Agenda/Minutes of the VIS Meeting on 2018/3/30

2018/3/30 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Business trip plan
    • March 25(Toyama),26th-29th(Kamioka),30th(Preliminary day Toyama->Tokyo)

  • Installation place-->PRM,PR3,PR2,BS,SR2(However,only to install. Launch is done on another occasion.)

    • —>Completed

  • Prepare necessary documents —>

    • JGW-S1808015,S1808016,S1808017,S1808021,S1808022,S1808010,S1808011,S1808012

Plan for coming weeks

  • Next install plan
    • I plan to install SR3 and SRM after completion of installation.
    • Actual launch is scheduled for May or later.

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 4/2):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 4/9):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/4/6(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180330 (last edited 2018-03-30 15:41:55 by YoichiAso)