2018/3/30 13:30 -

Participants:
2018/3/30 13:30 - 14:50

Participants: Okutomi, Enzo, Takahashi, Shoda, Aso, Sato, Fujii, Fujii, Tanaka, Ishizaki, Tanioka, Hirata
Line 78: Line 78:
 * The drawing of the ballast masses are almost done. Shoda will ask for quotation soon.
Line 86: Line 86:
 * After re-starting the computer, the issue reported last week was fixed.
Line 94: Line 94:

==== Plan for coming weeks ====
Control Issue:
 * BS
  * The whitening filter of only IMH high power coil driver is on somehow, without anti-whitening filter. It should be fixed at some point, maybe after Phase-I.
 * SR2
  * BIO issue was fixed and TFs of IM, BF, and SF are measured.

==== Plan for coming weeks ====

==== Plan for week of 4/2 ====
 * Mark at Mitaka Mon, Kamioka from Tue.
 * Shoda-san at Mitaka
 * Others at Kamioka
 * --
 * Finish BFs tasks (cabling +calibration)
 * Finish SFs tasks (cabling +calibration)
 * Add cable clamps to bases.
 * Add cable clamps and Cu segments to caps (only if they fit well).
 * Build 2xIM, 2xIRM
 * Glue SR3 mirror?

==== Plan for week of 4/9 ====
 * Shoda-san at Mitaka
 * Fujii-san at Mitaka
 * Tanioka-san at Mitaka?
 * Others at Kamioka
 * --
 * OSEM calibration
 * Finish IMs and IRMs
 * Build 1xRM
 * Glue SR3 mirror?

==== Plan for week of 4/16 ====
 * Shoda-san at Mitaka
 * Fujii-san at Mitaka
 * Tanioka-san at Mitaka?
 * Others at Kamioka
 * --
 * Start SR3 Hang?

==== Plan for week of 4/23 ====
 * Shoda-san at Mitaka
 * Others at Kamioka
 * --
 * F0 blade prototype test

==== Plan for week of 4/30 ====
  * Golden Week!

==== Discussions =====
 * 52.15kg optimal load for BF No.1 may be too low. We need to change the ballast masses for the IM.
 * Aso will check the delivery date of SR3 with Hirose-san.
 * Length sensing OpLev of BS is strange. We need a calibration.
Line 128: Line 178:
 * Incidents:  * Incidents: no incident
Line 131: Line 181:
  * Type-A:
  * Type-B:
  * Type-A: Crane work
  * Type-B: Crane work, working with springs.
Line 136: Line 186:
=== Phase 1 Operation ===
 * Stay in ICRR lodging
  * Okutomi: Locomotion 4/23 - 5/1
  * Tanioka: Yuuki House 4/23 - 5/1
  * Kozu ?
 * Emergency contact list
  * Type-A: Okutomi, Takahashi
  * Type-B: Mark, Fujii
  * Type-Bp: Shoda, Miyo(?)

=== Misc ===
 * Can the PR2-PR3 duct be permanently installed ?
  * For working with PR2 and PR3, it is OK to have the duct installed.
 * Publications/Presentations related to KAGRA in FY2017
  * Please send the list to Aso by April 6th.
 * Bus time table change
  * Seek for a possibility to renting parking spots for the lease cars.
Line 139: Line 206:
  * Takahashi:
  * Okutomi:
  * Sato:
  * Ishizaki:
  * Mark:
  * Hirata:
  * Enzo:
  * Takahashi:  3-6
  * Okutomi: 3-6
  * Sato: 3-6
  * Ishizaki: 3-6
  * Mark: 3-6
  * Hirata: 3-6
  * Enzo: 3-5
Line 148: Line 215:
  * Fujii:
  * Tanioka:
  * Fujii: 3-6
  * Tanioka: 3-6
Line 151: Line 218:
  * Kozu (ICRR):   * Kozu (ICRR): 3-6
Line 156: Line 223:
  * Takahashi:
  * Okutomi:
  * Sato:
  * Ishizaki:
  * Mark:
  * Hirata:
  * Enzo:
  * Takahashi: 10 - 13
  * Okutomi: 9 - 13
  * Sato: 9 - 13
  * Ishizaki: 9 - 13
  * Mark: 9 - 13
  * Hirata: 9 - 13
  * Enzo: 9 - 12
Line 166: Line 233:
  * Tanioka:   * Tanioka: 9 - 13
Line 168: Line 235:
  * Kozu (ICRR):   * Kozu (ICRR): 9 - 13

Agenda/Minutes of the VIS Meeting on 2018/3/30

2018/3/30 13:30 - 14:50

Participants: Okutomi, Enzo, Takahashi, Shoda, Aso, Sato, Fujii, Fujii, Tanaka, Ishizaki, Tanioka, Hirata

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-end]

  • Adjusted the weight of cryo-payload (CP).
  • Adjusted the height of F1, F2, and F3 using the FRs. The height of BF was set to 80mm.
  • Set the height of F0 keystone to 5.5mm adjusting the weight on the keystone.
  • Aligned the CP using the yaw adjustment screw in F0.
  • Adjusted the position of secondary coils for the BF damper.
  • Released the IP. Adjusted the horizontal FRs. Applied the DC control.
  • Closed the top chamber.

[X-front]

  • Cabled the LVDT-Actuator and the FR in the F1.
  • Mounted the F1 onto the EQ stop with the maraging wire.
  • Cabled between the F2 and the F1.
  • Calibrated the LVDT of F1.
  • The height of keystone was too low without additional weight on the F2.
  • Compressed four blades.
  • Replaced the blade of FR from the F2 type to the F1 type.
  • Measured the transfer functions. The frequency of F1 was 0.3Hz.
  • Found that the F3 is not working.
  • Disassembled the F1 stage to lift up the F3.

Plan for coming weeks

[X-front]

  • Recover the F3.
  • Go buck to the F1 stage.
  • Prepare for the pre-isolator.

Type B (Mark)

Past week report

Report for week of 3/26

BFs:

  • BF No. 1:
    • Fujii-san finished tuning. Optimal load: 52.15[kg]. Resonance frequency: 0.37[Hz]. Optimal height: 64.7[mm].
    • We wired the LVDT, Picomotor and Steppermotor.
    • We measured the keystone tilt at different points and the differences are within 0.1[mm]
    • We added cable clamps to the base.
  • BF No.7:
    • Tanioka-san and Fujii-san replaced the blades corresponding to the BS for the SR type blades.
    • The yoke position was corrected.
    • The fishing rod was assembled.
    • Compression tuning is ongoing.??

SFs:

  • Hirata-san and Tanioka-san set up the frame to check the SFs.
  • SF (B2-5):
    • Hirata-san, Fujii-san and Tanioka-san checked the optimal load with and without cap. The optimal load changes about 250[g]. The cap didn't come out smoothly.
    • We measured the keystone tilt at different points, and the differences are within 0.1[mm] (65.5, 65.5, 65.5, 65.4)
  • SF (B2-6):
    • Hirata-san, Fujii-san and Tanioka-san checked the optimal load with and without cap (On going?).
    • We measured the keystone tilt at different points, and the differences are within 0.3[mm] (63.7, 63.5,63.8, 63.8)

SR3/SRM:

  • Kozu-kun and Enzo finished the SR3 in-air cabling.
  • Enzo prepared the SR3 and SRM rack in parallel (On going).
  • The drawing of the ballast masses are almost done. Shoda will ask for quotation soon.

SR2:

  • Hirata-san tested the safety bars in the SR2 area.
  • We got new power supply for the SR2 Rack. Before, the power was coming from the BS rack.

BS:

  • After re-starting the computer, the issue reported last week was fixed.
  • Kozu-kun and Enzo helped Enomoto-san troubleshooting the BS Oplev issue (On going).

Shipping:

  • We received the LBB parts for SR2.
  • We received the Payload parts (IM and IRM) this morning.

Control Issue:

  • BS
    • The whitening filter of only IMH high power coil driver is on somehow, without anti-whitening filter. It should be fixed at some point, maybe after Phase-I.
  • SR2
    • BIO issue was fixed and TFs of IM, BF, and SF are measured.

Plan for coming weeks

Plan for week of 4/2

  • Mark at Mitaka Mon, Kamioka from Tue.
  • Shoda-san at Mitaka
  • Others at Kamioka
  • --
  • Finish BFs tasks (cabling +calibration)
  • Finish SFs tasks (cabling +calibration)
  • Add cable clamps to bases.
  • Add cable clamps and Cu segments to caps (only if they fit well).
  • Build 2xIM, 2xIRM
  • Glue SR3 mirror?

Plan for week of 4/9

  • Shoda-san at Mitaka
  • Fujii-san at Mitaka
  • Tanioka-san at Mitaka?
  • Others at Kamioka
  • --
  • OSEM calibration
  • Finish IMs and IRMs
  • Build 1xRM
  • Glue SR3 mirror?

Plan for week of 4/16

  • Shoda-san at Mitaka
  • Fujii-san at Mitaka
  • Tanioka-san at Mitaka?
  • Others at Kamioka
  • --
  • Start SR3 Hang?

Plan for week of 4/23

  • Shoda-san at Mitaka
  • Others at Kamioka
  • --
  • F0 blade prototype test

Plan for week of 4/30

  • Golden Week!

==== Discussions =====

  • 52.15kg optimal load for BF No.1 may be too low. We need to change the ballast masses for the IM.
  • Aso will check the delivery date of SR3 with Hirose-san.
  • Length sensing OpLev of BS is strange. We need a calibration.

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

Watchdog system (Tanaka)

Past week report

  • Business trip plan
    • March 25(Toyama),26th-29th(Kamioka),30th(Preliminary day Toyama->Tokyo)

  • Installation place-->PRM,PR3,PR2,BS,SR2(However,only to install. Launch is done on another occasion.)

    • —>Completed

  • Prepare necessary documents —>

    • JGW-S1808015,S1808016,S1808017,S1808021,S1808022,S1808010,S1808011,S1808012

Plan for coming weeks

  • Next install plan
    • I plan to install SR3 and SRM after completion of installation.
    • Actual launch is scheduled for May or later.

Other site works

Safety

  • Incidents: no incident
  • Foreseen risks
    • Type-A: Crane work
    • Type-B: Crane work, working with springs.
    • Type-Bp:

Discussion

Phase 1 Operation

  • Stay in ICRR lodging
    • Okutomi: Locomotion 4/23 - 5/1
    • Tanioka: Yuuki House 4/23 - 5/1
    • Kozu ?
  • Emergency contact list
    • Type-A: Okutomi, Takahashi
    • Type-B: Mark, Fujii
    • Type-Bp: Shoda, Miyo(?)

Misc

  • Can the PR2-PR3 duct be permanently installed ?
    • For working with PR2 and PR3, it is OK to have the duct installed.
  • Publications/Presentations related to KAGRA in FY2017
    • Please send the list to Aso by April 6th.
  • Bus time table change
    • Seek for a possibility to renting parking spots for the lease cars.

Travel Plans

  • Travel (Week of 4/2):
    • Takahashi: 3-6
    • Okutomi: 3-6
    • Sato: 3-6
    • Ishizaki: 3-6
    • Mark: 3-6
    • Hirata: 3-6
    • Enzo: 3-5
    • Shoda:
    • Ohishi:
    • Fujii: 3-6
    • Tanioka: 3-6
    • Tanaka:
    • Kozu (ICRR): 3-6
    • Arai (ICRR):
  • Travel (Week of 4/9):
    • Takahashi: 10 - 13
    • Okutomi: 9 - 13
    • Sato: 9 - 13
    • Ishizaki: 9 - 13
    • Mark: 9 - 13
    • Hirata: 9 - 13
    • Enzo: 9 - 12
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka: 9 - 13
    • Tanaka:
    • Kozu (ICRR): 9 - 13
    • Arai (ICRR):

Next meeting

On 2018/4/6(Fri)