2018/4/6 13:30 - | 2018/4/6 13:30 - 14:50 |
Line 5: | Line 5: |
Participants: | Participants: Enzo, Shoda, Takahashi, Aso, Tanaka, Okutomi, Sato, Tanioka, Fujii, Ishizaki, Hirata, Mark |
Line 15: | Line 15: |
[X-front] * Lifted up the EQ stop to access the F3 and recovered the touching problem in the F3. * Lifted down the EQ stop again. Extended the EQ stop to the F1 stage. * Tuned the F1. The lowest frequency was 0.45Hz. When the filter was suspended with the cap, it went to the bi-stable. * Decompressed the blades. Finally the frequency was around 0.5Hz. * Checked the FR in the F1. Adjustable rage of keystone was +/- 4mm. * Cabled around the F1 and checked the cable connection. * Lifted down the EQ stop. The end plate for the F1 was sit on the frame lock. * Extended the EQ stop to the top ring. [X-end] * Adjusted the height of filters. * Connected the PT100 sensor to the monitor line for CRY. * Check the FR range in the BF. |
|
Line 17: | Line 33: |
[X-front] * Set the bridge frame. * Prepare for the pre-isolator. |
|
Line 18: | Line 38: |
==== Past week report ==== ==== Plan for coming weeks ==== |
==== Report for week of 4/2 ==== * Fujii-kun and Yamamoto-kun got the SR3 real time model running. * We received the SR3. * However Mark and Tanioka-kun found Hirose-san had applied the First Contact patterns on the wrong sides, so we took it to Yamamoto-san's lab and Toyama University and re-applied the FC properly. We also bounced a 1064 nm beam off it to verify that the HR and AR coatings were not also swapped (they were OK). * We made magnet-standoff assemblies for both SR3 and SRM, and set up for gluing the prisms and magnets. We will attach the prisms and magnet-standoffs on Monday. * Hirata-san did inventory of the SR3/SRM payload parts received last week and started on the inventory of screws. * Fujii-kun, Enzo and team finished the preparation, adjustment of the SFs and BFs. * They calibrated one SF and BF. (The remaining one SF and BF will take about another day. Also, the FR stops need to be checked.) * Enzo and Kozu-kun finished setting up the SR3 and SRM racks. (The SRM rack still lacks a front-end, and power and network connections, but the SR3 is now ready for testing.) * Shoda-san worked on getting quotes for the ballast masses, on design of the SRM metal mass, and on splitting the BS model to reduce the load on the front-end computer. ==== Plan for week of 4/9 ==== * Shoda-san at Mitaka * Fujii-san at Mitaka * Tanioka-san at Kamioka, but possibly doing PEM stuff. * Others at Kamioka * -- * Finish SRM BF and SF calibration * Finish IMs and IRMs * Glue SR3 mirror ==== Plan for week of 4/16 ==== * Shoda-san at Mitaka * Fujii-san at Mitaka * Tanioka-san at Mitaka? * Others at Kamioka * -- * Build 1xRM * Start SR3 Hang * Align assembly frame. ==== Plan for week of 4/23 ==== * Shoda-san at Mitaka * Fujii-san at Mitaka? * Mark, Enzo at Kamioka * Hirata-san at Mitaka * Tanioka-san at Mitaka? * -- * Clean parts (cable clamp bases, etc, etc). * Observe KAGRA Phase 1 operations, assist if problems arise. ==== Plan for week of 4/30 ==== * Golden Week! ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/March2018]] * [[KAGRA/Subgroups/VIS/TypeB/April2018]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779-v1 Type B Schedule (SR)]] ==== Vacation Info ==== * Fabian vacation, 3/26-4/27 (then gone). |
Line 23: | Line 95: |
* I found that the most of the magnet direction of PRM IM flag are facing wrong. We should fix the consistency with the compensation magnets at some point. | |
Line 36: | Line 109: |
* Incidents: | * Incidents: no incident |
Line 48: | Line 121: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Hirata: * Enzo: |
* Takahashi: 10 - 13 * Okutomi: 9 - 13 * Sato: 9 - 13 * Ishizaki: 9 - 13 * Mark: 9 - 13 * Hirata: 9 - 13 * Enzo: 9 - 12 |
Line 58: | Line 131: |
* Tanioka: | * Tanioka: 9 - 13 |
Line 60: | Line 133: |
* Kozu (ICRR): | * Kozu (ICRR): 9 - 13 ? |
Line 65: | Line 138: |
* Takahashi: * Okutomi: * Sato: * Ishizaki: * Mark: * Hirata: * Enzo: |
* Takahashi: 16- 20 * Okutomi: 16- 20 * Sato: 16- 20 * Ishizaki: 16- 20 * Mark: 16- 20 * Hirata: 16- 20 * Enzo: 16- 20 |
Line 75: | Line 148: |
* Tanioka: | * Tanioka: |
Line 77: | Line 150: |
* Kozu (ICRR): | * Kozu (ICRR): 16- 20? |
Agenda/Minutes of the VIS Meeting on 2018/4/6
2018/4/6 13:30 - 14:50
Participants: Enzo, Shoda, Takahashi, Aso, Tanaka, Okutomi, Sato, Tanioka, Fujii, Ishizaki, Hirata, Mark
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[X-front]
- Lifted up the EQ stop to access the F3 and recovered the touching problem in the F3.
- Lifted down the EQ stop again. Extended the EQ stop to the F1 stage.
- Tuned the F1. The lowest frequency was 0.45Hz. When the filter was suspended with the cap, it went to the bi-stable.
- Decompressed the blades. Finally the frequency was around 0.5Hz.
- Checked the FR in the F1. Adjustable rage of keystone was +/- 4mm.
- Cabled around the F1 and checked the cable connection.
- Lifted down the EQ stop. The end plate for the F1 was sit on the frame lock.
- Extended the EQ stop to the top ring.
[X-end]
- Adjusted the height of filters.
- Connected the PT100 sensor to the monitor line for CRY.
- Check the FR range in the BF.
Plan for coming weeks
[X-front]
- Set the bridge frame.
- Prepare for the pre-isolator.
Type B (Mark)
Report for week of 4/2
- Fujii-kun and Yamamoto-kun got the SR3 real time model running.
- We received the SR3.
- However Mark and Tanioka-kun found Hirose-san had applied the First Contact patterns on the wrong sides, so we took it to Yamamoto-san's lab and Toyama University and re-applied the FC properly. We also bounced a 1064 nm beam off it to verify that the HR and AR coatings were not also swapped (they were OK).
- We made magnet-standoff assemblies for both SR3 and SRM, and set up for gluing the prisms and magnets. We will attach the prisms and magnet-standoffs on Monday.
- Hirata-san did inventory of the SR3/SRM payload parts received last week and started on the inventory of screws.
- Fujii-kun, Enzo and team finished the preparation, adjustment of the SFs and BFs.
- They calibrated one SF and BF. (The remaining one SF and BF will take about another day. Also, the FR stops need to be checked.)
- Enzo and Kozu-kun finished setting up the SR3 and SRM racks. (The SRM rack still lacks a front-end, and power and network connections, but the SR3 is now ready for testing.)
- Shoda-san worked on getting quotes for the ballast masses, on design of the SRM metal mass, and on splitting the BS model to reduce the load on the front-end computer.
Plan for week of 4/9
- Shoda-san at Mitaka
- Fujii-san at Mitaka
- Tanioka-san at Kamioka, but possibly doing PEM stuff.
- Others at Kamioka
- --
- Finish SRM BF and SF calibration
- Finish IMs and IRMs
- Glue SR3 mirror
Plan for week of 4/16
- Shoda-san at Mitaka
- Fujii-san at Mitaka
- Tanioka-san at Mitaka?
- Others at Kamioka
- --
- Build 1xRM
- Start SR3 Hang
- Align assembly frame.
Plan for week of 4/23
- Shoda-san at Mitaka
- Fujii-san at Mitaka?
- Mark, Enzo at Kamioka
- Hirata-san at Mitaka
- Tanioka-san at Mitaka?
- --
- Clean parts (cable clamp bases, etc, etc).
- Observe KAGRA Phase 1 operations, assist if problems arise.
Plan for week of 4/30
- Golden Week!
To-Do Lists, Schedule
Vacation Info
- Fabian vacation, 3/26-4/27 (then gone).
Type-Bp (Shoda)
Past week report
- I found that the most of the magnet direction of PRM IM flag are facing wrong. We should fix the consistency with the compensation magnets at some point.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents: no incident
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- F2F talk
Travel Plans
- Travel (Week of 4/9):
- Takahashi: 10 - 13
- Okutomi: 9 - 13
- Sato: 9 - 13
- Ishizaki: 9 - 13
- Mark: 9 - 13
- Hirata: 9 - 13
- Enzo: 9 - 12
- Shoda:
- Ohishi:
- Fujii:
- Tanioka: 9 - 13
- Tanaka:
- Kozu (ICRR): 9 - 13 ?
- Arai (ICRR):
- Travel (Week of 4/16):
- Takahashi: 16- 20
- Okutomi: 16- 20
- Sato: 16- 20
- Ishizaki: 16- 20
- Mark: 16- 20
- Hirata: 16- 20
- Enzo: 16- 20
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR): 16- 20?
- Arai (ICRR):
Next meeting
On 2018/4/13(Fri)