Differences between revisions 2 and 3
Revision 2 as of 2018-04-13 11:55:22
Size: 1808
Editor: AyakaShoda
Comment:
Revision 3 as of 2018-04-13 12:05:12
Size: 2303
Editor: NaokoOhishi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 * Estimated effect of OSEM magnetism
  *https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ProcessDocumentAdd
  *If you find any mistake, please let me know.
 * Checked drawings in detail and ordered some minor change of drawings.
 
 * OMMT mirrors have delivered to Kashiwa.
  *OMMT1: diameter 99.95mm, thickness 55.58mm(max), wedge 2.45deg
  *OMMT2: diameter 99.97mm, thickness 55.08mm(max), wedge 3.3deg
Line 33: Line 42:
 * Order mechanical parts
 * Calculate standoff position of OMMT mirrors

Agenda/Minutes of the VIS Meeting on 2018/4/13

2018/4/13 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

  • SRM design is on going.
  • LBB ballast mass design is on going.
  • Control Issue
    • Start discussion about the Phase-I measurement. The coupling measurement is the main target (since L to L should be measured by OLG measurement.)
    • Creating control simulation tools (including noise budgeting) for VIS.

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Estimated effect of OSEM magnetism
  • Checked drawings in detail and ordered some minor change of drawings.
  • OMMT mirrors have delivered to Kashiwa.
    • OMMT1: diameter 99.95mm, thickness 55.58mm(max), wedge 2.45deg
    • OMMT2: diameter 99.97mm, thickness 55.08mm(max), wedge 3.3deg

Plan for coming weeks

  • Order mechanical parts
  • Calculate standoff position of OMMT mirrors

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Composite SRM design (Shoda)

Travel Plans

  • Travel (Week of 4/16):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 4/23):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/4/20(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180413 (last edited 2018-04-13 17:17:45 by YoichiAso)