[X-front]
  * Set the bridge frame on the footholds.
  * Installed the IP and TF into the clean booth.
  * Combined the IP and the TF.
  * Dismounted the GAS blades from the TF.
  * Assembled the FR on the TF.
  * Assembled the new designed yaw actuator on the TF. Not completed.
  * Prepared the damper ring with magnets for the F1.
  * Cabled around the TF.
  * Repairing the side stoppers for the IY EQ stop.
Line 16: Line 28:

[X-front]
  * Mount the GAS blades on the TF.
  * Set the PI on the bridge frame.
  * Tune the TF.
  * Cable between the F1 and PI.
Line 35: Line 53:
 * Checked drawings in detail and ordered some minor change of drawings.  * Checked drawings in detail and ordered some minor changes of drawings.
Line 37: Line 55:
 * OMMT mirrors have delivered to Kashiwa.  * OMMT mirrors have been delivered to Kashiwa.

Agenda/Minutes of the VIS Meeting on 2018/4/13

2018/4/13 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • Set the bridge frame on the footholds.
  • Installed the IP and TF into the clean booth.
  • Combined the IP and the TF.
  • Dismounted the GAS blades from the TF.
  • Assembled the FR on the TF.
  • Assembled the new designed yaw actuator on the TF. Not completed.
  • Prepared the damper ring with magnets for the F1.
  • Cabled around the TF.
  • Repairing the side stoppers for the IY EQ stop.

Plan for coming weeks

[X-front]

  • Mount the GAS blades on the TF.
  • Set the PI on the bridge frame.
  • Tune the TF.
  • Cable between the F1 and PI.

Type B (Mark)

Past week report

  • SRM design is on going.
  • LBB ballast mass design is on going.
  • Control Issue
    • Start discussion about the Phase-I measurement. The coupling measurement is the main target (since L to L should be measured by OLG measurement.)
    • Creating control simulation tools (including noise budgeting) for VIS.

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Estimated effect of OSEM magnetism
  • Checked drawings in detail and ordered some minor changes of drawings.
  • OMMT mirrors have been delivered to Kashiwa.
    • OMMT1: diameter 99.95mm, thickness 55.58mm(max), wedge 2.45deg
    • OMMT2: diameter 99.97mm, thickness 55.08mm(max), wedge 3.3deg

Plan for coming weeks

  • Order mechanical parts
  • Calculate standoff position of OMMT mirrors

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Composite SRM design (Shoda)

Travel Plans

  • Travel (Week of 4/16):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 4/23):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/4/20(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180413 (last edited 2018-04-13 17:17:45 by YoichiAso)