⇤ ← Revision 1 as of 2018-04-27 09:10:38
Size: 1460
Comment:
|
Size: 2389
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
[X-front] * Suspended the filter chain from the TF. * Attached two cross tubes and four feedthroughs onto the top chamber. * Cabled from the upper small hexagon to the feedthroughs. * Replaced the guide clamps for two blades with thin guards. Compressed the blades by 3~8mm respectively. * Released the keystone of TF. The height of keystone was too low without additional load. Frequency was 1.4Hz (too high). * Repaired the thread hole for the hook screw for the SF damper. * Attached the EQ stop anchor. Adjusted the horizontal position of the EQ stop. * Checked the LVDT signals. Found the F1 keystone touching to the secondary coil. When the F1 sit on the release sensor, it was free. * Set the LVDT drivers to the rack. Calibrating the LVDTs for the BF damper. |
|
Line 16: | Line 28: |
[X-front] * Solve the problem in the F1. * Tune the IP. * Set the ACCs. * Set the LVDT coils for the BF damper. |
Agenda/Minutes of the VIS Meeting on 2018/4/27
2018/4/27 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[X-front]
- Suspended the filter chain from the TF.
- Attached two cross tubes and four feedthroughs onto the top chamber.
- Cabled from the upper small hexagon to the feedthroughs.
- Replaced the guide clamps for two blades with thin guards. Compressed the blades by 3~8mm respectively.
- Released the keystone of TF. The height of keystone was too low without additional load. Frequency was 1.4Hz (too high).
- Repaired the thread hole for the hook screw for the SF damper.
- Attached the EQ stop anchor. Adjusted the horizontal position of the EQ stop.
- Checked the LVDT signals. Found the F1 keystone touching to the secondary coil. When the F1 sit on the release sensor, it was free.
- Set the LVDT drivers to the rack. Calibrating the LVDTs for the BF damper.
Plan for coming weeks
[X-front]
- Solve the problem in the F1.
- Tune the IP.
- Set the ACCs.
- Set the LVDT coils for the BF damper.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 4/30):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 5/7):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/5/11(Fri)