Line 45: Line 45:
 * I have ordered some parts; stages, standoffs, and magnets.
Line 46: Line 47:
 * I will check the response of the vertical vibration isolation bellows
 and will order remaining 8 bellows.

Agenda/Minutes of the VIS Meeting on 2018/4/27

2018/4/27 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • Suspended the filter chain from the TF.
  • Attached two cross tubes and four feedthroughs onto the top chamber.
  • Cabled from the upper small hexagon to the feedthroughs.
  • Replaced the guide clamps for two blades with thin guards. Compressed the blades by 3~8mm respectively.
  • Released the keystone of TF. The height of keystone was too low without additional load. Frequency was 1.4Hz (too high).
  • Repaired the thread hole for the hook screw for the SF damper.
  • Attached the EQ stop anchor. Adjusted the horizontal position of the EQ stop.
  • Checked the LVDT signals. Found the F1 keystone touching to the secondary coil. When the F1 sit on the release sensor, it was free.
  • Set the LVDT drivers to the rack. Calibrating the LVDTs for the BF damper.

Plan for coming weeks

[X-front]

  • Solve the problem in the F1.
  • Tune the IP.
  • Set the ACCs.
  • Set the LVDT coils for the BF damper.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • I have ordered some parts; stages, standoffs, and magnets.

Plan for coming weeks

  • I will check the response of the vertical vibration isolation bellows and will order remaining 8 bellows.

Watchdog system (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
    • Type-A: When we replaced the guide clamp, the blade clamp slipped out.
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

Travel Plans

  • Travel (Week of 4/30):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 5/7):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/5/11(Fri)