[X-front] * Dismounted the PI from the top chamber and lifted up the EQ stop to access the F1. * Adjusted the position of the yoke in F1. * Removed one of Cu plates from the F1. Rearranged the magnets on the F1 damper. * Lifted down the EQ stop. Set the top ring onto the frame lock. * Installed the PI into the top chamber. * Suspended the F1. The F1 worked freely. * Calibrated the LVDT for the TF. * Cabled from the upper small hexagon to the feedthroughs and checked the cable connections. * Adjusted compression of the blades. * Released the IP. The behavior of IP showed overload without any ballast rings. * Found that the IP unit is not for Type-A but for SR. * Dismounted the PI from the top chamber. * Calibrated the LVDTs for BF damper. [X-end] * Mirapro fixed the corrugate tube more tightly. |
|
Line 16: | Line 35: |
[X-front] * Swap the IP and reinstall the PI. * Tune the IP. * Set the ACCs. * Set the LVDT coils for the BF damper. [SR] * Check the optimal load of new blade prototype on 15th. [Exchanging of IPs] * Separate the PI for SRM to the IP and the TF. * Transport the IPs from/to 2F. * Combine the PI and the TF. |
Agenda/Minutes of the VIS Meeting on 2018/5/11
2018/5/11 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[X-front]
- Dismounted the PI from the top chamber and lifted up the EQ stop to access the F1.
- Adjusted the position of the yoke in F1.
- Removed one of Cu plates from the F1. Rearranged the magnets on the F1 damper.
- Lifted down the EQ stop. Set the top ring onto the frame lock.
- Installed the PI into the top chamber.
- Suspended the F1. The F1 worked freely.
- Calibrated the LVDT for the TF.
- Cabled from the upper small hexagon to the feedthroughs and checked the cable connections.
- Adjusted compression of the blades.
- Released the IP. The behavior of IP showed overload without any ballast rings.
- Found that the IP unit is not for Type-A but for SR.
- Dismounted the PI from the top chamber.
- Calibrated the LVDTs for BF damper.
[X-end]
- Mirapro fixed the corrugate tube more tightly.
Plan for coming weeks
[X-front]
- Swap the IP and reinstall the PI.
- Tune the IP.
- Set the ACCs.
- Set the LVDT coils for the BF damper.
[SR]
- Check the optimal load of new blade prototype on 15th.
[Exchanging of IPs]
- Separate the PI for SRM to the IP and the TF.
- Transport the IPs from/to 2F.
- Combine the PI and the TF.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- Have checked the spring constant of the vertical vibration isolation bellows for type-C suspension.
- The constant was about 0.05kgf/mm as required, so I'm asking for a quotation of remaining bellows.
- Have ordered some screws, mechanical parts, and received magnets.
Plan for coming weeks
- As the MCF tank opened, I will check the status of MCo suspension with Kirii-san.
- Continue to order mechanical parts.
LVDT Driver (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- PR3 release
- JPS/ASJ talks
Travel Plans
- Travel (Week of 5/14):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 5/21):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting