[X-front]
  * Dismounted the PI from the top chamber and lifted up the EQ stop to access the F1.
  * Adjusted the position of the yoke in F1.
  * Removed one of Cu plates from the F1. Rearranged the magnets on the F1 damper.
  * Lifted down the EQ stop. Set the top ring onto the frame lock.
  * Installed the PI into the top chamber.
  * Suspended the F1. The F1 worked freely.
  * Calibrated the LVDT for the TF.
  * Cabled from the upper small hexagon to the feedthroughs and checked the cable connections.
  * Adjusted compression of the blades.
  * Released the IP. The behavior of IP showed overload without any ballast rings.
  * Found that the IP unit is not for Type-A but for SR.
  * Dismounted the PI from the top chamber.
  * Calibrated the LVDTs for BF damper.

[X-end]
  * Mirapro fixed the corrugate tube more tightly.
Line 16: Line 35:

[X-front]
  * Swap the IP and reinstall the PI.
  * Tune the IP.
  * Set the ACCs.
  * Set the LVDT coils for the BF damper.

[SR]
  * Check the optimal load of new blade prototype on 15th.

[Exchanging of IPs]
  * Separate the PI for SRM to the IP and the TF.
  * Transport the IPs from/to 2F.
  * Combine the PI and the TF.

Agenda/Minutes of the VIS Meeting on 2018/5/11

2018/5/11 13:30 -

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[X-front]

  • Dismounted the PI from the top chamber and lifted up the EQ stop to access the F1.
  • Adjusted the position of the yoke in F1.
  • Removed one of Cu plates from the F1. Rearranged the magnets on the F1 damper.
  • Lifted down the EQ stop. Set the top ring onto the frame lock.
  • Installed the PI into the top chamber.
  • Suspended the F1. The F1 worked freely.
  • Calibrated the LVDT for the TF.
  • Cabled from the upper small hexagon to the feedthroughs and checked the cable connections.
  • Adjusted compression of the blades.
  • Released the IP. The behavior of IP showed overload without any ballast rings.
  • Found that the IP unit is not for Type-A but for SR.
  • Dismounted the PI from the top chamber.
  • Calibrated the LVDTs for BF damper.

[X-end]

  • Mirapro fixed the corrugate tube more tightly.

Plan for coming weeks

[X-front]

  • Swap the IP and reinstall the PI.
  • Tune the IP.
  • Set the ACCs.
  • Set the LVDT coils for the BF damper.

[SR]

  • Check the optimal load of new blade prototype on 15th.

[Exchanging of IPs]

  • Separate the PI for SRM to the IP and the TF.
  • Transport the IPs from/to 2F.
  • Combine the PI and the TF.

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Have checked the spring constant of the vertical vibration isolation bellows for type-C suspension.
  • The constant was about 0.05kgf/mm as required, so I'm asking for a quotation of remaining bellows.
  • Have ordered some screws, mechanical parts, and received magnets.

Plan for coming weeks

  • As the MCF tank opened, I will check the status of MCo suspension with Kirii-san.
  • Continue to order mechanical parts.

LVDT Driver (Tanaka)

Past week report

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • PR3 release
  • JPS/ASJ talks

Travel Plans

  • Travel (Week of 5/14):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 5/21):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/5/25(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180511 (last edited 2018-05-11 17:11:40 by AkihisaKondo)