= Agenda/Minutes of the VIS Meeting on 2018/6/1 = 2018/6/1 13:30 - 14:40 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Tanioka, Tanaka, Takahashi, Sato, Aso, Hirata, Mark, Enzo, Arai, Shoda, Fujii, Ishizaki == Progress report == === Schedule Chart === Type-A : ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7320|PDF/MPP]]) Type-B: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|PDF/MPP]]) === Type-A (Takahashi) === ==== Past week report ==== [Y-front] * Transported the DP parts, the ballast rings, and the hand lifter from X-end. * Transported other items (footholds, hoist tool, etc.) from X-front. * Opened the top chamber. * Assembled the EQ stop for DP. The release sensors and the side stoppers were attached. * Assembled the DP itself. Set the DP on the end plate. * Extended the EQ stop for the BF stage. * Opened the cross tube. Installed the protection net ring. * Installed the EQ stop with the DP into the top chamber. * Opened the cup of BF. Cabled the LVDT, the stepping motor, the picomotor and the PT100. * Pre-assembled the BF dampers. * Closed the cup of BF. Attached the primary coils on the cup. * Measured the weight of BF. * Attached the cone bellows on the bottom of top chamber. * Put the SUS sheet on the floor around the cross tube. ==== Plan for coming weeks ==== * Install the BF. Tune the BF * Go to the F3 stage. * Replace the blades for the TF in X-front. === Type B (Mark) === ==== Report for week of 5/28 ==== * Enzo tested the LVDT driver repaired by Tanaka-san - it was fine. * Fujii-kun and Enzo finished assembling a batch of 4 geophones and took test data. * Hirata-san modified some Promec masses (drilling out the threads on 2 of 4 holes) so we could use two layers of them inside the BF. * Hirata-san installed maraging rod receptacles in the LBB damper rings, and in the bottom of PIs #3 and #1 (for the SF damper rings). * After consulting with various people, Hirata-san installed the second half of the LBB top ring in the chamber, simply omitting the pillar and screw associated with the badly threaded hole. * Hirata-san took delivery of the screws for the LBB blade units, made up 9 blade units and installed 6 of them on PI #3 and #1 (for SR3 and SR2). * Hirata-san made up a set of PI cable clamps and installed them on PI #3 (for SR3). * Hirata-san removed the prototype blades from PI #3 to get ready for testing the final blades. * We located the #355 disk and #356 poles for the next level of the security structure up to the SF and installed the poles. * We installed ballast mass in the BF. After some trial and error we settled on 16 Promec masses (7.1 kg) inside the BF and 5 D1808104-4 and 3 D1808104-5 masses (540 g) on the cap. * Enzo and Fujii-kun did several rounds of TFs on the BF/... section of the suspension and debugged a problem with dewhitening filters not being installed in the OSEMINF filter bank. * Enzo installed damping filters for the IM OSEMs. SRM * 2D drawing for SRM is done. Waiting for Hirata-san's check. BS * Eleonora, Midooka-kun, and Arai-kun calibrated length sensing oplev([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5121|klog21]]) * Eleonora and Midooka-kun worked on the diagonalization of BS IM. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5133|klog5133]]) * Confirmed the stepping motor actuation on IP stage via medm using BS. * Maximum coil output during the initial alignment (later half of Dec. 2017) was 30 mA in IMV, 3 mA in IMH, 60 m A in TM. ==== Plan for week of 6/4 ==== * Mark, Enzo, Hirata-san, Kozu-kun at Kamioka Tue-Fri. (Mon is NAOJ medical checkup.) * Terrence Tsang from CUHK joins from Wed 6/8. * -- * Cable and test BF cap picos. * Crane in security structure disk at SF level. * Crane in SF and remove cap. * Hook BF and adjust total ballast. * Route cables through SF-BF flying saucer up to bottom of SF. * Adjust BF trim mass. * Readjust payload. * Take TFs. * Characterize final F0 blades. ==== Plan for week of 6/11 ==== * Mark Enzo, Hirata-san, Kozu-kun at Kamioka Tue-Fri (Mon is compensation day for f2f.) * -- * Any unfinished SR3 SF/... stuff. * Add budgeted ballast mass to SF and weigh SF/... section. * Cable, test SF LVDT and FR. * Rebuild F0 #3 for SR3. * Park F0 #1 (for SR2) in top of SR3 assembly frame. * Move F0 #3 behind SR3. ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779-v1 Type B Schedule (SR)]] ==== Vacation Info ==== === Type-Bp (Shoda) === ==== Past week report ==== * PR3 optic was released by Miyo-kun and Arai-kun. * Izumi-san reported the mirror slipping during the filter tuning. ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5136|klog5136]]) ==== Plan for coming weeks ==== * Diagonalization of IM/TM stages. === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === LVDT Driver (Tanaka) === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: no incident * Foreseen risks * Type-A: Crane * Type-B: Crane, Blade sprins * Type-Bp: == Discussion == === ITMX connection to DGS === * Plan to do it in the week of June 11th * Fujii + Enzo (if available) === High power coil driver for Type-B === * Necessary current during in-air alignment work * IMV:max~10000cnt~3V~30mA * IMH:max~1000cnt~0.3V~3mA * TM:max~20000cnt~6V~60mA * Will consult with AEL (Aso) === Composite SRM === * 2D drawings were made * Asked Hirata-san to check them * If no problem, we will proceed to getting quotes. === New VIS members === * Terrence Tsang from the Chinese University of Hong Kong will join us from June 6th * Another student from WIMP will arrive later === Remote Desktop === * Two workstations also available * k1ctr6: 10.68.10.56 * k1ctr7: 10.68.10.57 More info: http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/RemoteDesktop == Travel Plans == * Travel (Week of 6/4): * Takahashi: 5 - 8 * Okutomi: * Sato: 5 - 8 * Ishizaki: * Mark: 5 - 8 * Hirata: 5 - 8 * Enzo: 5 - 8 * Shoda: * Ohishi: * Fujii: * Tanioka: 5 - 8 * Tanaka: * Kozu (ICRR): 5 - 8 * Arai (ICRR): * Terrence: 6 - 8 * Travel (Week of 6/11): * Takahashi: 11 - 15 * Okutomi: * Sato: 12 - 15 * Ishizaki: * Mark: 12 - 15 * Hirata: 12 - 15 * Enzo: 12 - 15 * Shoda: * Ohishi: * Fujii: 11 - 15 * Tanioka: * Tanaka: * Kozu (ICRR): 12 - 15 * Arai (ICRR): * Terrence: 11 - 15 == Next meeting == On 2018/6/8(Fri)