*Delivery of parts(7915,7815) --> (6/6) *I responded by exchanging abnormal parts of the power regulator U31(-15V 7915) and the line drivers U25,U30 and U29(THAT1646). *Report[[https://gwdoc.icrr.u-tokyo.ac.jp/DocDB/0083/E1808359/001/Report%20on%20failure%20diagnosis%20and%20repair%20of%20LVDT%20driver%20180608.pdf | JGW-E1808359(PDF)]] *Later,I would like to check the actual on KAGRA site. |
|
Line 34: | Line 39: |
*I am working on designing and researching them. |
Agenda/Minutes of the VIS Meeting on 2018/6/8
2018/6/8 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
LVDT Driver (Tanaka)
Past week report
Delivery of parts(7915,7815) --> (6/6)
- I responded by exchanging abnormal parts of the power regulator U31(-15V 7915) and the line drivers U25,U30 and U29(THAT1646).
ReportJGW-E1808359(PDF)
- Later,I would like to check the actual on KAGRA site.
Plan for coming weeks
- I am working on designing and researching them.
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 6/11):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Terrence:
- Travel (Week of 6/18):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Terrence:
Next meeting
On 2018/6/15(Fri)