Size: 2789
Comment:
|
Size: 2795
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 28: | Line 28: |
<<BR>> |
Agenda/Minutes of the VIS Meeting on 2018/6/8
2018/6/8 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Calculated the noise budget in pitch angular fluctuation. Compared with the actual spectra, it looks quite consistent. (calculation and actual spectra)The same calculation will be done for PRs as well.
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- PR3
- There was not DAC output since 6/3. After rebooting k1pro0, it was fixed.
- PR2
- Some of BF LVDT had wrong polarity. They are fixed. It may happen when we released the SF GAS keystone.
- One of the IM coil drivers and GAS coil driver seems to be tripped. But no BIO signal is coming. Needs to be fixed.
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
LVDT Driver (Tanaka)
Past week report
Delivery of parts(7915,7815) --> (6/6)
- I responded by exchanging abnormal parts of the power regulator U31(-15V 7915) and the line drivers U25,U30 and U29(THAT1646).
ReportJGW-E1808359(PDF)
- Later,I would like to check the actual on KAGRA site.
Plan for coming weeks
- I am working on designing and researching them.
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 6/11):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Terrence:
- Travel (Week of 6/18):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Terrence:
Next meeting
On 2018/6/15(Fri)