Agenda/Minutes of the VIS Meeting on 2018/6/22

2018/6/22 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[Y-front]

  • Calibrated the LVDT. The position of the secondary coil was shifted down by 4mm.
  • Closed the cup of F3. Suspended the F3 by the crane with the filter chain.
  • Tuned the F3 again. The tuned frequency was 0.24Hz.
  • Cabled around the F3. Checked cable connection. Two disconnections were found and repaired.
  • Fixed the additional weight on the BF.
  • Swapped the primary coils to the dummy weight on the BF.
  • Lifted down the EQ stop. The end plate for F3 was sit on the frame lock.
  • Started the assembly of the end plate for F2.
  • Embedded the FR in the F2.

[X-front]

  • Embedded the magic wands to the TF. The support point was set closing to the keystone and the counter weight was set in the outer side to obtain large torque.
  • The height of keystone was 20mm with a compression of 22mm. The frequency was still aroud 1Hz.
  • Transported the hand lifters to the cross tube area.

Plan for coming weeks

  • Setting of the F2 stage in Y-front.
  • Dismount of the DP in X-front.
  • Wiring between the cryo-payload and the BF in X-front.

Type B (Mark)

Past week report

  • Eleonora was working on BS IM diagonalization.

Plan for coming weeks

Type-Bp (Shoda)

Past week report

  • Decay time measurement on PR3 is done. fig

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Ordered some mechanical parts.
  • Making a list of OMMT mechanical parts.

Plan for coming weeks

  • Will order OMMT mechanical parts.
  • Prepare glueing jig.

LVDT Driver (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • 6/26: 9:00 - 12:00
    • Relocation of a power line pole (telephone pole) outside of the tunnel
    • A small possibility of accidental power outage
    • Shutdown all the VIS control in this period.

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:
    • Type-Bp:

Discussion

  • Relocation of SR assembly frame
    • July 12(Thu) - 13(Fri)
  • IP swap
    • July 17 - 20
    • 17: Separate IP and TF in the OMC area
    • 18: Transport IPs from/to 2F
    • 19: Assemble IP and TF for SRM (OMC area)
    • 20: Assemble IP and TF for ITMY (2F)
    • Main work is done by Sato-san with help from Type-B team
  • Binary I/O Converter Chassis
    • Share the box between WDS and Stepper motor driver box
    • (PRM, PR3): 1
    • (PR2, BS): 1
    • (SR2): 1
    • (SR3, SRM): 1
    • ETMX: 1
    • ETMY: 1
    • ITMX: 1
    • ITMY: 1
    • Total: 8

Travel Plans

  • Travel (Week of 6/25):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
    • Terrence:
  • Travel (Week of 7/2):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
    • Terrence:

Next meeting

On 2018/6/29(Fri)