[Y-front] * Tested the additional FR blade using temporal parts. The height of keystone was lifted up to 67mm. * Cabled between the F2 and F3. * Suspended the F3 from the F2 and checked the behavior of F3/BF. * Transported the cross tubes for the feedthroughs from Y-end and attached them onto the top chamber. * Installed the LAN cables for the stepping motor drivers through the corrugate tube. * Set the some analog drivers on the rack and cabled them to the digital front-end. * Embedded the additional FR using the F2 blade. About 3kg was necessary as additional mass to obtain the optimal height. * Changed the additional FR blade to the F3 one. The height was 67mm without any additional masses. |
|
Line 18: | Line 29: |
* Setting of the F2. |
Agenda/Minutes of the VIS Meeting on 2018/7/6
2018/7/6 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[Y-front]
- Tested the additional FR blade using temporal parts. The height of keystone was lifted up to 67mm.
- Cabled between the F2 and F3.
- Suspended the F3 from the F2 and checked the behavior of F3/BF.
- Transported the cross tubes for the feedthroughs from Y-end and attached them onto the top chamber.
- Installed the LAN cables for the stepping motor drivers through the corrugate tube.
- Set the some analog drivers on the rack and cabled them to the digital front-end.
- Embedded the additional FR using the F2 blade. About 3kg was necessary as additional mass to obtain the optimal height.
- Changed the additional FR blade to the F3 one. The height was 67mm without any additional masses.
Plan for coming weeks
- Setting of the F2.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
LVDT Driver (Tanaka)
Past week report
Plan for coming weeks
Other site works
- Sept 10(Mon): Planned power outage
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 7/9):
- Takahashi:
- Okutomi:
- Sato:
- Lucia
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Terrence:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 7/16):
- Takahashi:
- Okutomi:
- Sato:
- Lucia
- Ishizaki:
- Mark:
- Hirata:
- Enzo:
- Terrence:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/7/13(Fri)