Differences between revisions 2 and 3
Revision 2 as of 2018-07-18 16:51:00
Size: 1884
Editor: YoichiAso
Comment:
Revision 3 as of 2018-07-20 12:44:15
Size: 1990
Editor: EnzoTapia
Comment:
Deletions are marked like this. Additions are marked like this.
Line 54: Line 54:
 * Survey to point out different aspects that should be covered in a introductory lecture for KAGRA.

Agenda/Minutes of the VIS Meeting on 2018/7/20

2018/7/20 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • July 26 11:30 - 12:30: Monthly crane inspection
  • Sept 10(Mon): Planned power outage

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

  • ETMX F2 status
  • SR2 TF optimal load problem
  • SR cable procurement
  • VIS talk at the F2F in Toyama U
  • VIS introduction page

  • Survey to point out different aspects that should be covered in a introductory lecture for KAGRA.

Travel Plans

  • Travel (Week of 7/23):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Panwei
    • Terrence:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 7/30):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo:
    • Terrence:
    • Panwei
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/7/27(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180720 (last edited 2018-07-27 13:23:24 by NaokoOhishi)