= Agenda/Minutes of the VIS Meeting on 2018/7/20 = 2018/7/20 13:30 - 15:00 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Mark, Takahashi, Aso, Panwei, Terrence, Fabian, Enzo, Hirata, Pan, Okutomi, Sato, Tanioka, Ishizaki, Fujii, Lucia, Eleonora, Tanaka, Shoda, Kozu == Progress report == === Schedule Chart === Type-A : ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7320|PDF/MPP]]) Type-B: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|PDF/MPP]]) === Type-A (Takahashi) === ==== Past week report ==== [SRM] * Dismounted the top filter for SRM from the IP for Type-A. Packed the IP to the box. * Combined the top filter and the IP. [Y-front] * Transported the IPs from/to the first floor. * Measured the transfer functions of the BF/F3/F2 by the digital system. * Cabled in the F1. * Assembled the cup of F1 (Cu plates, connector plates) and closed the cup. * Measured the weight of F1. [X-front] * Evaluated the ACCs. * Fixed the cables between the cryo-payload (CP) and the BF at the lower points on the wire. * Connected the cables to the BF. * The CP was installed and suspended from the BF. * Adjusted the height of CP. The height of BF was set to 67.5mm. ==== Plan for coming weeks ==== * Setting of the F1 in Y-front. * Setting of the top filter in X-front. === Type B (Mark) === ==== Report for week of 7/17 ==== * We checked the polarity of the IP LVDTs and flipped coil connections to get the standard arrangement. * We debugged an issue where one of the LVDT actuators had half the magnets in backwards resulting in no force. * We calibrated all the PI LVDTs. * We set the SF damper ring gap. * We prepped the suspension for craning, moved it into the tank and hooked the LBB damper ring rods. * Type A merged the SRM F0 with the correct IP, and we moved it out of the way (to the second floor behind the SRM tank). * We installed more cable clamps on the SR2 PI. ==== Plan for week of 7/23 ==== * Mark, Enzo, Fabian, Kozu-kun, Terrence, Panwei at Kamioka Mon-Fri. * Hirata-san at Kamioka Mon-Thu. * Mirapro moves assembly frame ≈7/25 (Wed). ===== SR3 ===== * Unlock suspension. * Rearrange cables. * Test. ===== SR2 ===== * Finish PI prep. * Crane into AF, suspend. * Start cable routing. ===== SRM ===== * Prepare to assemble SRM metal mass (most parts due Wed 7/25). * Help Mirapro with AF move. * Start rebuild of top filter of PI #2. ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]] ==== Vacation Info ==== * Hirata-san at Mitaka 7/27. * Terrence: 8/24-26 f2f, then returns to Hong Kong. * Enzo: 9/14 JPS, 9/15 through 10/8 vacation in Chile. === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== * IMMT2 screw replacement finished (July 9th-20th). * Measure TF in the week after next. * Got a quotation of OMMT/OSTM. ==== Plan for coming weeks ==== * Order OMMT/OSTM mechanical parts. === VIS electronics (Tanaka) === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === * July 26 11:30 - 12:30: Monthly crane inspection * Sept 10(Mon): Planned power outage === Safety === * Incidents: no incident * Foreseen risks * Type-A: Crane work * Type-B: Crane work, holes in the 2F == Discussion == * ETMX F2 status * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=5539|klog]] * F2 is stuck * We will leave it stuck for O3 * Geophones or Accelerometers ? * We will use Geophones for ITMs too. * We need to buy 6 more geophones. However the lead time can be long * SR2 TF optimal load problem * To be confirmed in the next week * SR cable procurement * Immediately necessary: 2.4m cables for OSEMs (x2), 5 Type-1 cables * Sato-san will order them soon * We need to make more Type-1 cables by the end of September * We need more cable material for this * Takahashi-san is waiting for a quote for PTFE cable material * VIS talk at the F2F in Toyama U * We will request 2 slots * VIS introduction [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/Introduction|page]] * Survey to point out different aspects that should be covered in a introductory lecture for KAGRA. [[https://docs.google.com/document/d/1jf9jNfU-ZDP0fjNZVo6yp0S7q91V8aa7qck7Mme0hrU/edit?usp=sharing|survey]] == Travel Plans == * Travel (Week of 7/23): * Takahashi: 23 - 27 * Okutomi: * Sato: 23 - 27 * Lucia: 23 - 27 * Ishizaki: * Mark: 23 - 27 * Hirata: 23 - 26 * Enzo: 23 - 27 * Panwei: 23 - 27 * Terrence: 23 - 27 * Shoda: * Ohishi: * Fujii: 24 - 27 * Tanioka: * Tanaka: * Kozu (ICRR): 23 - 26 * Arai (ICRR): * Eleonora: 23 - 26 * Hashimoto: 23 - 27 * Travel (Week of 7/30): * Takahashi: * Okutomi: * Sato: 7/30 - 8/3 * Lucia: 7/30 - 8/3 * Ishizaki: * Mark: 7/30 - 8/3 * Hirata: 7/30 - 8/3 * Enzo: 7/30 - 8/3 * Terrence: 7/30 - 8/3 * Panwei 7/30 - 8/3 * Shoda: * Ohishi: * Fujii: 7/30 - 8/3 * Tanioka: 7/30 - 8/3 * Tanaka: * Kozu (ICRR): 7/30 - 8/3 * Arai (ICRR): * Hatoya: 8/2 - 8/3 == Next meeting == On 2018/7/27(Fri)