Line 116: Line 116:
  * Sato:   * Sato: 7/30-8/3
Line 119: Line 119:
  * Mark:
  * Hirata:
  * Enzo:
  * Panwei
  * Mark: 7/30-8/3
  * Hirata: 7/30-8/3
  * Enzo: 7/30-8/3
  * Panwei:
Line 126: Line 126:
  * Fujii:   * Fujii: 8/1-8/3
Line 133: Line 133:
  * Takahashi:   * Takahashi: 8/6-10
Line 135: Line 135:
  * Sato:   * Sato: 8/6-10
Line 137: Line 137:
  * Ishizaki: 
  * Mark:
  * Hirata:
  * Enzo:
  * Terrence: 
  * Panwei
  * Shoda: 
  * Ohishi: 
  * Fujii:
  * Ishizaki:
  * Mark: 8/6-10
  * Hirata: 8/6-10
  * Enzo: 8/6-10
  * Terrence:
  * Panwei:
  * Shoda:
  * Ohishi:
  * Fujii: 8/6-10

Agenda/Minutes of the VIS Meeting on 2018/7/27

2018/7/27 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[Y-front]

  • Implemented the cabling in the F1.
  • Mounted the F1 on the end plate. The filter chain was suspended from the F1.
  • Calibrated the LVDT in the F1.
  • Implemented the cabling between the F1 and the F2.
  • Tuned the F1. Initially the proper frequency was 0.57Hz.
  • Added the compression to 8 blades by 0.5mm, The F1 went to the bi-stable.
  • Decompressed 4 blades. The proper frequency became 0.44Hz.
  • Closed the cup and suspended the F1 by crane. The keystone went to the lower limit.
  • Replaced the blades for the FR from the F2 type to F1 type.
  • Finally the proper frequency became 0.35Hz (corresponding to the tuning frequency of 0.22Hz) with the cup.
  • Checked the FR range. The FR can cover the full range of keystone.
  • Implemented the cabling around the F1.
  • Found that the primary coil was touching to the secondary coil in the F2. It was repaired.
  • Lifted down the EQ stop into the corrugate tube. The end plate for F1 sit on the frame lock.

[X-front]

  • Attached the additional FR on the TF.
  • Adjusted the height of keyston in the TF.

Plan for coming weeks

  • Setting of the pre-isolator.
  • Calibration of the LVDTs for BF damper.

Type B (Mark)

Report for week of 7/23

  • We finished adding cable clamps to the SR2 PI and SF.
  • We craned in the SR2 PI and installed the PI-SF rod. As expected, there was not quite enough load capacity for even a 2 Cu-segment SF.
  • We changed the CuBe spring on the SR2 PI from an F2 type to an F1 and got about an extra 2 kg, which is plenty for 2 Cu segments.

  • We moved the feedthroughs from the SR3 assembly frame to the SR3 tank. Mirapro then moved the assembly frame to the SRM area. Mirapro also moved the duct on the +Y side of the SR3 tank to give us access to that side.
  • We laid a new set of SR3 in-air cables running directly to the tank. (We will repurpose the original set for SRM.)
  • We reconnected the SR3 cables on both sides of the feedthroughs. We had to adjust the routing of the in-vacuum ones several times to stop them touching the tank, but we finally found a good solution.
  • With help from Ohishi-san we removed the First Contact and then unlocked the whole suspension by stages. We need to check the optic pitch and do a little more mechanical adjustment but we were able to take TFs and implement IM and GAS control filters.
  • Hirata-san and Fujii-kun received most of the SRM metal mass parts, did inventory and practiced some of the key steps in the assembly, especially inserting the Sol-Black coated parts without touching the delicate surfaces.
  • Mark did inventory of the BIO stuff for the WD and of the OL parts.

Plan for week of 7/30

  • Mark, Enzo, Hirata-san, Fabian, Kozu-kun, Terrence, Panwei at Kamioka Mon-Fri.
  • Kozu-kun works at Mozumi Mon, Fri, and Thu afternoon.

SR3
  • Finalize optic pitch, OSEM alignment.
  • Hook LBB, add ballast mass, set up temporary OL (horizontal beam, pitch/yaw only).
  • Identify/acquire items required for final OL (steering mirrors, second QPD, lens, collimator).

SR2
  • Fix issue with PI/SS/chain alignment.
  • Put magnets on SR damper ring (2 Cu segment pattern).
  • Remove PI-SF rod temporarily, install Cu segments and damper ring.
  • Do vertical height budget; choose optimum F0 keystone height.
  • Add estimated final ballast mass.
  • Do PI cable routing.
  • Adjust ballast/trim mass, with reserve for cables.

SRM
  • Set up filter tuning area.
  • Tune F0 for SRM.
  • Add LBB blade units, cable clamps etc.
  • Check PI coil connections, IP LVDT magnets.

To-Do Lists, Schedule

Vacation Info

  • Terrence: 8/24-26 f2f, then returns to Hong Kong.
  • Enzo: 9/14 JPS, 9/15 through 10/8 vacation in Chile.

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Sept 10(Mon): Planned power outage

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 7/30):
    • Takahashi:
    • Okutomi:
    • Sato: 7/30-8/3
    • Lucia:
    • Ishizaki:
    • Mark: 7/30-8/3
    • Hirata: 7/30-8/3
    • Enzo: 7/30-8/3
    • Panwei:
    • Terrence:
    • Shoda:
    • Ohishi:
    • Fujii: 8/1-8/3
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 8/6):
    • Takahashi: 8/6-10
    • Okutomi:
    • Sato: 8/6-10
    • Lucia:
    • Ishizaki:
    • Mark: 8/6-10
    • Hirata: 8/6-10
    • Enzo: 8/6-10
    • Terrence:
    • Panwei:
    • Shoda:
    • Ohishi:
    • Fujii: 8/6-10
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):