Differences between revisions 10 and 11
Revision 10 as of 2018-08-10 13:17:46
Size: 3163
Editor: NaokoOhishi
Comment:
Revision 11 as of 2018-08-10 14:34:13
Size: 3266
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 78: Line 78:
  * Takahashi:   * Takahashi: 15-17
Line 81: Line 81:
  * Lucia:   * Lucia: 15-17
Line 83: Line 83:
  * Mark:   * Mark: 
Line 85: Line 85:
  * Enzo:
  * Terrence:
  * Enzo: 15-17
  * Terrence: 15-17
Line 89: Line 89:
  * Fujii:   * Fujii: 15-17
Line 92: Line 92:
  * Kozu (ICRR):   * Kozu (ICRR): 15-17 ?
Line 96: Line 96:
  * Takahashi:   * Takahashi: 20 - 24
Line 98: Line 98:
  * Sato:
  * Lucia:
  * Sato: 20 - 24
  * Lucia: 20 - 24
Line 101: Line 101:
  * Mark:
  * Hirata:
  * Enzo:
  * Terrence:
  * Mark: 20 - 24
  * Hirata: 20 - 24
  * Enzo: 20 - 24
  * Terrence: 20 - 23
Line 107: Line 107:
  * Fujii:   * Fujii: 20 - 24
Line 110: Line 110:
  * Kozu (ICRR):   * Kozu (ICRR): 20 - 24

Agenda/Minutes of the VIS Meeting on 2018/8/10

2018/8/10 13:30 -

Zoom Meeting

Participants:

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[Y-front]

  • Put the ballast mass of 15.1kg on the keystone. The height of keystone was 10.0mm.
  • Calibrated the LVDT.
  • Checked the relative height of the F1 damper.
  • Dismounted the pre-isolaotor and the bridge frame from the foothold.
  • Implemented the cables between the F1 and the PI.
  • Lifted down the EQ stop into the corrugate tube. The top ring sit on the frame lock.
  • Adjusted the rotational direction and the center position of the EQ stop.
  • Installed the PI into the top chamber.
  • Hooked the wires to the receptacles. The filters were suspended from the TF.
  • Removed the wire clamp.
  • Implemented the cables from the PI to the feed through flanges.
  • Started the tuning of TF. Digital output for the coil driver did not work.

[X-front]

  • Released the BF.

Plan for coming weeks

  • Setting of the pre-isolator in Y-front (tuning of TF, calibration of LVDT, tuning of IP).
  • Setting of the pre-isolator in X-front (additional FR, yaw actuator).

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Have ordered 34 kinds of OMMT/OSTM suspension mechanical parts. Will be delivered by Oct. 6th.

Plan for coming weeks

  • Order remaining 26 kinds of parts.

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Sept 3 (Mon): Crane inspection 9:00 - 12:00
  • Sept 5 (Mon): Crane inspection 9:00 - 13:00
  • Sept 10(Mon): Planned power outage

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 8/13):
    • Takahashi: 15-17
    • Okutomi:
    • Sato:
    • Lucia: 15-17
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo: 15-17
    • Terrence: 15-17
    • Shoda:
    • Ohishi:
    • Fujii: 15-17
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR): 15-17 ?
    • Arai (ICRR):
  • Travel (Week of 8/20):
    • Takahashi: 20 - 24
    • Okutomi:
    • Sato: 20 - 24
    • Lucia: 20 - 24
    • Ishizaki:
    • Mark: 20 - 24
    • Hirata: 20 - 24
    • Enzo: 20 - 24
    • Terrence: 20 - 23
    • Shoda:
    • Ohishi:
    • Fujii: 20 - 24
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR): 20 - 24
    • Arai (ICRR):

Next meeting

On 2018/8/23(Fri)

KAGRA/Subgroups/VIS/VISMinutes20180810 (last edited 2018-08-29 11:56:54 by MarkBarton)