Differences between revisions 2 and 13 (spanning 11 versions)
Revision 2 as of 2018-08-10 09:40:53
Size: 1885
Editor: YoichiAso
Comment:
Revision 13 as of 2018-08-10 14:53:19
Size: 3825
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
2018/8/10 13:30 - 2018/8/10 13:30 - 14:38
Line 7: Line 7:
Participants: Participants: Mark, Takahashi, Enzo, Aso, Ohishi, Sato, Fujii, Fabian, Okutomi, Hirata, Lucia, Panwei, Terrence, Kozu, Hatoya, Enzo
Line 17: Line 17:

[Y-front]
  * Put the ballast mass of 15.1kg on the keystone. The height of keystone was 10.0mm.
  * Calibrated the LVDT.
  * Checked the relative height of the F1 damper.
  * Dismounted the pre-isolaotor and the bridge frame from the foothold.
  * Implemented the cables between the F1 and the PI.
  * Lifted down the EQ stop into the corrugate tube. The top ring sit on the frame lock.
  * Adjusted the rotational direction and the center position of the EQ stop.
  * Installed the PI into the top chamber.
  * Hooked the wires to the receptacles. The filters were suspended from the TF.
  * Removed the wire clamp.
  * Implemented the cables from the PI to the feed through flanges.
  * Started the tuning of TF. Digital output for the coil driver did not work.

[X-front]
  * Released the BF.
Line 18: Line 36:
  * Setting of the pre-isolator in Y-front (tuning of TF, calibration of LVDT, tuning of IP).
  * Setting of the pre-isolator in X-front (additional FR, yaw actuator).
Line 29: Line 49:
 * Have ordered 34 kinds of OMMT/OSTM suspension mechanical parts.
 Will be delivered by Oct. 6th.
Line 30: Line 52:
 * Order remaining 26 kinds of parts.
Line 41: Line 63:
 * Incidents:  * Incidents: no incident
Line 44: Line 66:
  * Type-A:
  * Type-B:
  * Type-A: Crane work
  * Type-B: Crane work. Transport heavy arc weights
Line 48: Line 70:
 * Satellite box modification
  * The chassis is not connected to the electric ground.
  * AEL is planning to fix the connection
  * OSEM read out path has a strange bump in the transfer function between 10Hz and 100Hz.
Line 50: Line 76:
  * VIS agrees to this proposal
 * SRM metal mirror
  * [[https://photos.app.goo.gl/zpR4DuDpdjSXZkKaA|https://photos.app.goo.gl/zpR4DuDpdjSXZkKaA]]
  * Hirata-san will design jigs to avoid the container to touch the black surface
  * Arrange with Hirose-san on how to test the SRM-M in Caltech
Line 53: Line 84:
  * Takahashi:   * Takahashi: 15-17
Line 56: Line 87:
  * Lucia:   * Lucia: 15-17
Line 58: Line 89:
  * Mark:   * Mark: 
Line 60: Line 91:
  * Enzo:
  * Terrence:
  * Enzo: 15-17
  * Terrence: 15-17
Line 64: Line 95:
  * Fujii:   * Fujii: 15-17
Line 67: Line 98:
  * Kozu (ICRR):   * Kozu (ICRR): 15-17 ?
Line 71: Line 102:
  * Takahashi:   * Takahashi: 20 - 24
Line 73: Line 104:
  * Sato:
  * Lucia:
  * Sato: 20 - 24
  * Lucia: 20 - 24
Line 76: Line 107:
  * Mark:
  * Hirata:
  * Enzo:
  * Terrence:
  * Mark: 20 - 24
  * Hirata: 20 - 24
  * Enzo: 20 - 24
  * Terrence: 20 - 23
Line 82: Line 113:
  * Fujii:   * Fujii: 20 - 24
Line 85: Line 116:
  * Kozu (ICRR):   * Kozu (ICRR): 20 - 24

Agenda/Minutes of the VIS Meeting on 2018/8/10

2018/8/10 13:30 - 14:38

Zoom Meeting

Participants: Mark, Takahashi, Enzo, Aso, Ohishi, Sato, Fujii, Fabian, Okutomi, Hirata, Lucia, Panwei, Terrence, Kozu, Hatoya, Enzo

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-A (Takahashi)

Past week report

[Y-front]

  • Put the ballast mass of 15.1kg on the keystone. The height of keystone was 10.0mm.
  • Calibrated the LVDT.
  • Checked the relative height of the F1 damper.
  • Dismounted the pre-isolaotor and the bridge frame from the foothold.
  • Implemented the cables between the F1 and the PI.
  • Lifted down the EQ stop into the corrugate tube. The top ring sit on the frame lock.
  • Adjusted the rotational direction and the center position of the EQ stop.
  • Installed the PI into the top chamber.
  • Hooked the wires to the receptacles. The filters were suspended from the TF.
  • Removed the wire clamp.
  • Implemented the cables from the PI to the feed through flanges.
  • Started the tuning of TF. Digital output for the coil driver did not work.

[X-front]

  • Released the BF.

Plan for coming weeks

  • Setting of the pre-isolator in Y-front (tuning of TF, calibration of LVDT, tuning of IP).
  • Setting of the pre-isolator in X-front (additional FR, yaw actuator).

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

  • Have ordered 34 kinds of OMMT/OSTM suspension mechanical parts. Will be delivered by Oct. 6th.

Plan for coming weeks

  • Order remaining 26 kinds of parts.

VIS electronics (Tanaka)

Past week report

Plan for coming weeks

Other site works

  • Sept 3 (Mon): Crane inspection 9:00 - 12:00
  • Sept 5 (Mon): Crane inspection 9:00 - 13:00
  • Sept 10(Mon): Planned power outage

Safety

  • Incidents: no incident
  • Foreseen risks
    • Type-A: Crane work
    • Type-B: Crane work. Transport heavy arc weights

Discussion

Travel Plans

  • Travel (Week of 8/13):
    • Takahashi: 15-17
    • Okutomi:
    • Sato:
    • Lucia: 15-17
    • Ishizaki:
    • Mark:
    • Hirata:
    • Enzo: 15-17
    • Terrence: 15-17
    • Shoda:
    • Ohishi:
    • Fujii: 15-17
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR): 15-17 ?
    • Arai (ICRR):
  • Travel (Week of 8/20):
    • Takahashi: 20 - 24
    • Okutomi:
    • Sato: 20 - 24
    • Lucia: 20 - 24
    • Ishizaki:
    • Mark: 20 - 24
    • Hirata: 20 - 24
    • Enzo: 20 - 24
    • Terrence: 20 - 23
    • Shoda:
    • Ohishi:
    • Fujii: 20 - 24
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR): 20 - 24
    • Arai (ICRR):

Next meeting

On 2018/8/23(Fri)