= Agenda/Minutes of the VIS Meeting on 2018/9/21 = 2018/9/21 13:30 - 14:50 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants:Mark, Fabian, Kozu, Aso, Ohishi, Panwei, Hirata, Tanaka, Takahashi, Sato == Progress report == === Schedule Chart === Type-A : ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7320|PDF/MPP]]) Type-B: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|PDF/MPP]]) === Type-A (Takahashi) === ==== Past week report ==== [X-front] * Opened the BF cup to check the status of FR. * Found the deformed bracket to fix the FR blade onto the keystone. * The keystone dropped to the lower limit due to the deformation. * The FR tried to pull up the keystone, but the FR could not pull even though the slider reached at the upper limit. * The slider was tilted and stacked by the asymmetry of dual blades due to the deformation. [X-end] * Unhooked the wires from the receptacles. * Disconnected the in-vacuum cables from the feedthroughs. * Dismounted the PI from the top chamber. * Replaced the actuator coil for TF. * Mounted the PI onto the top chamber. * Hooked the wires to the receptacles. * Connected the in-vacuum cables to the feedthroughs. * Adjusted the height of BF. * Calibrated the LVDT for TF. ==== Plan for coming weeks ==== [Y-front] * Test of the yaw FR for the TF. [Y-end] * Assembly of the geophone pods and installation. [X-front] * Procurement of parts for the BF FR. [X-end] * Closing of the chambers completely for the evacuation. === Type B (Mark) === ==== Report for week of 9/17 ==== * Monday 9/17 was holiday. * We optimized the trim mass on the SF to get more balance torque with less total mass. We now have a reserve of 480 g for the yaw pico. * We set the SF damper gap to 6 mm. * We set the SR2 pitch with the optic lever, aligned the IRM, and set all the OSEMs to have good clearance and midrange output. * We locked the SR2 suspension, craned it into the tank and hooked the LBB damper rings (but not the LBB yet). * With help from Ohishi-san, we removed the First Contact from SR2. * Mark did an audit of all the electronics boxes and updated the item list and S-number file cards on JGWDoc. * Mark added some thin arc weights to the inventory and finalized the number of various types to order (8*38 mm + 9*10 mm). * Panwei copied control filters over from the SR3. ==== Plan for week of 9/24 ==== * Monday 9/24 is holiday (Autumn Equinox). * Mark, Hirata-san, Fabian, Panwei at Kamioka Tue-Fri. ===== SR2 ===== * Move SR2 in-air cables. * Unlock and realign suspension. ===== SRM ===== * Set pitch of SRM and RM, tighten clamps, remove winch system. * Weigh IM/... section. * Build up SS to BF level. * Add BF. * Suspend IM and tweak height/balance. ==== Plan for week of 10/1 ==== * Mark, Hirata-san, Fabian, Panwei at Kamioka Mon-Fri. ===== SRM ===== * Cable/test BF. * Install IRM. * Install/cable/test IM OSEMs. ==== Plan for week of 10/8 ==== * Monday 10/8 is Sports Day. * Enzo returns Tuesday 10/9. * Mark and Terrence (plus TBD) at Kamioka Mon-Fri. * Enzo, Hirata-san, Fabian and Panwei at Kamioka Tue-Fri. ===== SR2/SR3 ===== * Terrence to set up LEN half of SR3 OL and, time permitting, TILT and LEN for SR2. ===== SRM ===== * Continue installation. ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]] ==== Vacation/Visitor Info ==== * Enzo: 9/15 through 10/8 vacation in Chile. * Terrence: 10/8-12, 10/29-11/2 at Kamioka. === Type-Bp (Shoda) === ==== Past week report ==== * The orientation of the PRM mirror was adjusted to reflect the input beam back to the IFI * As a result, the IM OSEM went out of the range * We also found that the BF keystone was sitting on the EQ stop * We lifted the BF keystone with the fishing rod * Then we adjusted the OSEM positions, by entering the chamber, to get them back to the working range. * Now the PRM is in a good alignment state. * The transfer function measurement shows it is healthy. * Related klog entries [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6192|6192]] [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6215|6215]] ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== *Made a [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|Schedule]] ==== Plan for coming weeks ==== === VIS electronics (Tanaka) === ==== Past week report ==== *JGW-S1403045 Assembled Chassis of the KAGRA LVDT Driver *Received to MTK(NAOJ) for Repair 2018/09/18 *I had identified a broken board. And S1403073 removed. *Returned to Kamioka(Mozumi) 2018/09/19. *Waiting for parts(for repair) order and arrival for S1403073. ==== Plan for coming weeks ==== *I'll take a summer vacation. === Other site works === === Safety === * Incidents: no incident * Foreseen risks * Type-A: * Type-B: Crane work == Discussion == * LVDT driver tally again == Travel Plans == * Travel (Week of 9/24): * Takahashi: 26-28 * Okutomi: * Sato: 25-28 * Lucia: 25-28 * Fabian: 25-28 * Mark: 25-28 * Hirata: 25-28 * Enzo: * Shoda: * Ohishi: * Fujii: 25-28 * Tanioka: * Tanaka: * Kozu (ICRR): * Arai (ICRR): * Travel (Week of 10/1): * Takahashi: 1-5 * Okutomi: * Sato: 1-5 * Lucia: 1-5 * Fabian: 1-5 * Mark: 1-5 * Hirata: 1-5 * Enzo: * Shoda: * Ohishi: * Fujii: 2-5 * Tanioka: * Tanaka: * Kozu (ICRR): * Arai (ICRR): == Next meeting == On 2018/9/28(Fri)