Differences between revisions 2 and 3
Revision 2 as of 2018-10-02 23:26:05
Size: 1603
Editor: YoichiAso
Comment:
Revision 3 as of 2018-10-05 08:07:17
Size: 1981
Comment:
Deletions are marked like this. Additions are marked like this.
Line 32: Line 32:
 *Delivery to Stepper motor driver(S1808436,S1808437,S1808438) from vendor.2018/10/01
  *Checked and shipped to Kamioka.2018/10/02

 *S1403073--Input LVDT Card Board S_No.(B_No.005)--
  *The repair of the faulty part(C118 22u tantalum) is completed.
  *Operation check of the circuit is completed. 2018/10/02
  *Shipment completed to Kamioka from MTK(NAOJ). 2018/10/03

Agenda/Minutes of the VIS Meeting on 2018/10/5

There is no meeting this week. Please report your progress here.

Progress report

Schedule Chart

Type-A : (PDF/MPP)

Type-B: (PDF/MPP)

Type-C: (XLSX)

Type-A (Takahashi)

Past week report

Plan for coming weeks

Type B (Mark)

Past week report

Plan for coming weeks

Type-Bp (Shoda)

Past week report

Plan for coming weeks

OMMT & OSTM (Ohishi)

Past week report

Plan for coming weeks

VIS electronics (Tanaka)

Past week report

  • Delivery to Stepper motor driver(S1808436,S1808437,S1808438) from vendor.2018/10/01
    • Checked and shipped to Kamioka.2018/10/02
  • S1403073--Input LVDT Card Board S_No.(B_No.005)--

    • The repair of the faulty part(C118 22u tantalum) is completed.
    • Operation check of the circuit is completed. 2018/10/02
    • Shipment completed to Kamioka from MTK(NAOJ). 2018/10/03

Plan for coming weeks

Other site works

Safety

  • Incidents:
  • Foreseen risks
    • Type-A:
    • Type-B:

Discussion

Travel Plans

  • Travel (Week of 10/8):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):
  • Travel (Week of 10/15):
    • Takahashi:
    • Okutomi:
    • Sato:
    • Lucia:
    • Fabian:
    • Mark:
    • Hirata:
    • Enzo:
    • Shoda:
    • Ohishi:
    • Fujii:
    • Tanioka:
    • Tanaka:
    • Kozu (ICRR):
    • Arai (ICRR):

Next meeting

On 2018/10/12(Fri)

KAGRA/Subgroups/VIS/VISMinutes20181005 (last edited 2018-10-05 20:36:14 by RyutaroTakahashi)