Size: 2626
Comment:
|
Size: 2709
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 37: | Line 37: |
* Designing the yaw stepping motor mechanism. We need to procure 4 more motors. |
Agenda/Minutes of the VIS Meeting on 2018/10/19
2018/10/19 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[X-front]
- Corrected the tilt of IP base by jack up/down of the corn bellows.
- Adjusted the position of IP by the stepping motors.
- Aligned the TM by the yaw picomoter in the BF.
[X-end]
- Corrected the tilt of IP base by jack up/down of the corn bellows.
- It was difficult to adjust the position of IP by the stepping motors due to the tight stopper setting.
- Vented the EXV chamber and open the top chamber.
- Released the stopper for IP more.
- Adjusted the position of IP by hand/stepping motors.
- Aligned the TM by the yaw picomoter in the BF.
- Closed the top chamber and started the evacuation.
- Followed the drift of IP position by the stepping motors during the evacuation.
[Y-front]
- Investigated the 70Hz peak in the spectrum of IP LVDTs. Changed the modulation frequency from 10,000Hz to 10,003Hz.
- Designing the yaw stepping motor mechanism. We need to procure 4 more motors.
Plan for coming weeks
[Y-front]
- Replacement of the FR parts for BF. (10/22, 23)
[Y-end]
- Assembly of the geophone pods and installation. (10/24)
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 10/22):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 10/29):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/10/26(Fri)