Agenda/Minutes of the VIS Meeting on 2018/11/2
2018/11/2 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-front]
- Removed the ballast masses from the DP.
- Disassembled and dismounted the DP.
- Installed the suspension wires with the junction box.
- Put the cables along the wire through the shield pipe.
[Y-end]
- Assembled the geophone pods.
- Confirmed the direction of LVDTs on the IP.
Plan for coming weeks
- Installation of the cryo-payload in Y-front.
- Calibration of the geophones for Y-end.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents: When I dismounted the DP, I gut a blood blister on my finger. (R. Takahashi)
- Foreseen risks
- Type-A:
- Type-B:
Discussion
- JPS/APS presentations
Travel Plans
- Travel (Week of 11/5):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/12):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/11/9(Fri)