⇤ ← Revision 1 as of 2018-11-14 12:10:32
Size: 1623
Comment:
|
Size: 1876
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
[Y-end] * Assembled and calibrated the geophones. [in Mitaka] * Designed and ordered the yaw FR parts. * Designed the ballast weight for TF. |
|
Line 20: | Line 27: |
* Adjustment of the filer position in IYV/EYV. * Installation of the geophone pods to EYV. |
Agenda/Minutes of the VIS Meeting on 2018/11/16
2018/11/16 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-end]
- Assembled and calibrated the geophones.
[in Mitaka]
- Designed and ordered the yaw FR parts.
- Designed the ballast weight for TF.
Plan for coming weeks
- Adjustment of the filer position in IYV/EYV.
- Installation of the geophone pods to EYV.
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
Travel Plans
- Travel (Week of 11/19):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
- Travel (Week of 11/26):
- Takahashi:
- Okutomi:
- Sato:
- Lucia:
- Fabian:
- Mark:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanioka:
- Tanaka:
- Kozu (ICRR):
- Arai (ICRR):
Next meeting
On 2018/11/30(Fri)