= Agenda/Minutes of the VIS Meeting on 2018/11/16 = 2018/11/16 13:30 - 15:00 [[https://zoom.us/j/203743987|Zoom Meeting]] Participants: Mark, Enzo, Aso, Takahashi, Sato, Kozu, Tanaka, Hirata, Fujii, Fabian, Lucia, Eleonora, Okutomi, Ishizaki == Progress report == === Schedule Chart === Type-A : ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7320|PDF/MPP]]) Type-B: ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|PDF/MPP]]) Type-C: ([[ https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9013|XLSX]]) === Type-A (Takahashi) === ==== Past week report ==== [Y-end] * Assembled and calibrated the geophones. [Mitaka] * Designed and ordered the yaw FR parts. * Designed the ballast weight for TF. ==== Plan for coming weeks ==== * Adjustment of the filer position in IYV/EYV. * Installation of the geophone pods to EYV. === Type B (Mark) === ==== Report for week of 11/12 ==== * SRM * Hirata-san and Mark craned the LBB ring sandwich to the ceiling of the lower half of the tank, and set the heights of the jacks on the upper half. * Fabian and Hirata-san finished the in-vacuum cabling. * Enzo ran DC power to the second SRM stepper driver and did the rest of the in-air cabling. * We're now ready for final tests of the SF/... items and initial tests of the PI items. * Enzo and Fujii-kun built three geophones for SRM. They still need testing/characterization/sealing. * Mark worked on the height budget. * SR2 * Enzo experimented with [[http://www2.mpq.mpg.de/~ros/geo600_docu/soft/liso/manual.pdf|LISO]] (circuit analysis software which, among other functions, can fit measured TFs with a ZPK model) but then wrote his own fitting software in Python and used it to build Foton models of key TFs of the SR2. (These are in slots FM6-FM8 of the DAMP blocks and should not be accidentally enabled.) ==== To-Do Lists, Schedule ==== * [[KAGRA/Subgroups/VIS/TypeB/ToDoBS]] * [[KAGRA/Subgroups/VIS/TypeB/ToDoSR]] * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7779|JGW-L1807779 Type B Schedule (SR)]] ==== Plan for week of 11/19 ==== * Friday 11/23 is Labor Thanksgiving Day. * Mark, Enzo and Fabian at Kamioka Mon-Thu. * Hirata-san at Kamioka Tue-Thu (Mitaka on Mon for Engineering Promotion Office meeting). ===== SRM ===== * Characterize geophones. * Go/no-go test of all electronics items, especially SF/... section. * Finish vertical height check and adjust SF trim mass as required. * Unlock IP and center roughly. * Check/adjust alignment of SS. * Calibrate IP LVDTs. * Add arc weights and geophones. * Improve centering/tuning of IP and SS alignment. * Disconnect cables at feedthroughs, lock suspension. * Crane into tank. ===== SR2 ===== * Assist MIF team with pico cables and LBB breadboard ballast. * Install SR2 OL pillar, shelf and viewports (with AOL supervision)? ==== Plan for week of 11/26 ==== * Move SRM in-air cables over to tank. * Remove First Contact. * Unlock and align SRM. * Hook and roughly ballast LBB. * Move furniture near SR racks to prepare for flooring repair (week of 12/10) ==== Plan for week of 12/3 ==== * f2f Meeting at NAOJ - no Kamioka work. ==== Vacation/Event Info ==== * Hirata-san at Mitaka, Mon 11/19 (Engineering Promotion Office meeting). === Type-Bp (Shoda) === ==== Past week report ==== ==== Plan for coming weeks ==== === OMMT & OSTM (Ohishi) === ==== Past week report ==== ==== Plan for coming weeks ==== === VIS electronics (Tanaka) === ==== Past week report ==== ==== Plan for coming weeks ==== === Other site works === === Safety === * Incidents: * Foreseen risks * Type-A: * Type-B: == Discussion == === December VIS work and vacuum work === * 12/10-11: Break the vacuum. Need to monitor the IP drift (BS, ITMX, ETMX) * 12/12-14: BS maintenance works * 12/12-13: Y-front Type-A Yaw FR replacement * 12/13: PR2 remove the broken IM OSEM cable -> repair * 12/17 - : Lazer hazard starts * 12/17: PR2 install a new cable * 12/17-21: X-front Type-A Yaw FR replacement, X-end Type-A Yaw FR replacement & FR repair * 12/24-28: Y-end Type-A Yaw FR replacement * 12/17-21: SR Yaw FR installation * 1/15 - : Center area, X-front and Y-end vacumm pumping. Need to monitor IP drift (BS, SR, ITMX, ETMY) * 1/21 - : Y-end vacuum break. Y-front vacuum pumping. Need to monitor drift (ETMY, ITMY) * 2/4 - : Y-end vacuum pumping. Need to monitor drift (ETMY) == Travel Plans == * Travel (Week of 11/19): * Takahashi: 19-22 * Okutomi: * Sato: 19-21 * Lucia: 19-22 * Fabian: 19-22 * Mark: 19-22 * Hirata: 20-22 * Enzo: 19-22 * Shoda: * Ohishi: * Fujii: 20-22 * Tanioka: * Tanaka: * Kozu (ICRR): * Arai (ICRR): * Travel (Week of 11/26): * Takahashi: 26-30 * Okutomi: * Sato: * Lucia: 26-30 * Fabian: 26-30 * Mark: 26-30 * Hirata: 26-29(?) * Enzo: 26-29 * Shoda: * Ohishi: * Fujii: 27-30 * Tanioka: * Tanaka: * Kozu (ICRR): * Arai (ICRR): == Next meeting == On 2018/11/30(Fri)